1.1 Inspections Work before Operation
1.1.1 Checking of Power Supply and Air Pressure
(1) Confirmation of Power Supply
Confirm that the local main breaker connected with this machine is
"ON".
• Voltage : 200 ± 20 V AC, 3-Phase
• Apparent Power : Approx. 5kVA
(2) Confirmation of Air Pressure
Confirm that the air pressure is set to the value specified below.
• Main Pressure: 0.39 MPa (4 kgf/cm
2
)
Fig. 1C6
(a) The pressure switch is factory-set to "0.34 MPa (3.5 kgf/
cm
2
). Be sure not to change the setting.
(b) Use of Dry and Clean Air
If moisture, oil, or dust enters the pneumatic equipment
(an air cylinder, etc.) of this machine, it may result in a break-
down of the machine. Be sure to use dry and clean air.
Dry and Clean Air:
Moisture : Dew Point -17°C or lower (Atmospheric Pres-
sure)
Oil : 0.1 mg/m
3
(ANR) or less
Dust : Solid Material 0.01 µm or less
1.1 Inspections Work before Operation
Do not change the set pressure. Otherwise, an pneu-
matic equipment will not work correctly.
CAUTION
0304-006 Chapter 1 3-3 Tg0582-PM-D1


1.2 Preparation before Automatic Operation
1.2.1 Power ON Operation
(1) Check that the safety doors are closed.
(2) Remove the padlock from the lock lever of the power breaker.
Fig. 1C9
(3) Set the power breaker to "ON".
Power is supplied to the machine and the main power lamp illumi-
nates.
Fig. 1C10
1.2 Preparation before Automatic Operation
0211-005 Chapter 1 3-5 Tg0582-PM-D1