00195334-01 - 第19页

HS-50 transport contr oller 2 Retrofit instructions internal C onveyor control TSP200 in machine no .: 1-20 SIPLACE HS-50 08/2000 Edition 19 2 Fig. 2.5.2 TSP without conversion board Fig. 2.5 - 3 Conversion board

100%1 / 26
2 Retrofit instructions internal Conveyor control TSP200 in machine no.: 1-20 SIPLACE HS-50 HS-50 transport controller
08/2000 Edition
18
2.5 Preparatory work
: Remove the component trolleys (ideally on both sides on the dual conveyor).
: Switch the placement system off at the main switch.
: Remove the nozzle changers and tape cutters.
: Remove the attachment on the input side (if possible, in order to pull in the cables).
: Remove the covers from sector 1 and 4.
: Open up the retrofit version of the TSP200.
Detach the ribbon cables and the conversion boards.
2
Fig. 2.5 - 1 Complete retrofit kit
2
HS-50 transport controller 2 Retrofit instructions internal Conveyor control TSP200 in machine no.: 1-20 SIPLACE HS-50
08/2000 Edition
19
2
Fig. 2.5.2 TSP without conversion board
Fig. 2.5 - 3 Conversion board
2 Retrofit instructions internal Conveyor control TSP200 in machine no.: 1-20 SIPLACE HS-50 HS-50 transport controller
08/2000 Edition
20
2.6 Attaching the TSP in sector 1
: Use the base plate as a drilling template and mark the drilling positions.
2
: Cover the area around the sector well to prevent steel swarf reaching the cable duct.
2
240 mm
340 mm
250 mm