YS24X_Mainte_E - 第123页

4-4 4 Maintenance of options 2. UPS (Uninterr uptible Power Supply) 2.1 Replacing the UPS batter y (3 year) T he battery is a consumable item. Even though the service life of the UPS may v ary depending on the operating …

100%1 / 162
4-3
4
Maintenance of options
1.2 Replacing the ionizer discharge needle (2 year)
Replace the ionizer discharge needle (KHN-M83P2-00X: Needle/one discharge needle pack) once every 2
years or if the LED (+ERR, - ERR) showing the ion balance error does not go off even after performing the work
steps stated in "1.1 Cleaning the ionizer discharge needle". One ionizer uses 12 discharge needles. Normally,
one ionizer is installed on each of the front and rear of the machine. So, 24 (6 sets) discharge needles are
needed when performing the maintenance work of one machine.
1
Power off the ionizer.
e
1.
Press the emergency stop button and
open the machine safety cover to stop
the power supply to the ionizer.
2. Check all LED on the ionizer are OFF.
w
WARNING
A VOLTAGE REMAINS ON THE DISCHARGE NEEDLE
IMMEDIATELY AFTER TURNING OFF THE POWER. BE AWARE
THAT TOUCHING THE DISCHARGE NEEDLE IMMEDIATELY
AFTER TURNING OFF THE POWER IS HAZARDOUS.
2
Remove the discharge needle.
As shown at right, grasp and squeeze the
holder's opposing claws at two points and
squeeze them toward each other, then
extract discharge needle.
53402-L4-00
3
Replace the discharge needle.
When installing the new discharge needle,
the notched area on the mounting side must
be aligned with the discharge needle unit's
protruding part. When correctly aligned,
press it in.
4
(When the charge plate monitor is
installed,) check the static
elimination performance.
1. Turn ON the machine power.
2. Place the charge plate monitor at a
portion around the feeder pickup
position, and then check the static
elimination performance.
n
NOTE
The static elimination performance standard is that the
attenuation measurement time at the feeder pickup
position (a period of time to attenuate an electro static
charge of +1000V to +100V or less) is 15 sec. or less.
If the static elimination performance is not recovered or
if an error occurs on the ionizer side continuously even
after replacing the discharge needle, contact YAMAHA
sales representative.
n
NOTE
For detailed specification of the ionizer, see the
instruction manual established by the ionizer
manufacturer.
Removing the discharge needle
Step 2
Holder claws
4-4
4
Maintenance of options
2. UPS (Uninterruptible Power Supply)
2.1 Replacing the UPS battery (3 year)
The battery is a consumable item. Even though the service life of the UPS may vary depending on the operating
environment, such as ambient temperature, it is recommended to replace the battery with a new one at
reference intervals of 3 years. The following describes how to replace the battery that is incorporated into the
UPS.
w
WARNING
BATTERY REPLACEMENTS SHOULD BE PERFORMED ONLY BY THOSE WITH ELECTRICAL WORK EXPERIENCE.
1
Turn the machine power OFF.
Turn OFF the UPS power several seconds
after turning OFF the machine power.
w
WARNING
DO NOT ATTEMPT THIS BATTERY REPLACEMENT
PROCEDURE WHILE THE UPS FUNCTION IS RUNNING
(DURING AN EMERGENCY STOP, ETC.).
2
Remove the front panel.
Use a Phillips screwdriver to remove the
screws which secure the front panel, then
remove the front panel.
53408-L4-00
3
Disconnect the battery connector.
Disconnect the UPS side and internal battery
side connectors.
4
Remove the battery securing
fixture.
Remove the battery fixture mounting screws,
then remove the battery securing fixture.
5
Replace the removed battery with a
new one.
Extract the old battery and insert a new
battery in its place.
6
Reinstall the battery.
Reverse Steps 2 to 4 above to reinstall the
battery.
7
Check the UPS status.
1. Turn the machine power ON.
2. Press the ON button on the UPS operation
panel to check that the BATTERY LED is
OFF.
8
Write the battery replacement date.
Write the battery replacement date on the
UPS WARNING label (see "Safety instructions"
Safety instructions" in this manual).
n
NOTE
For UPS details, refer either to the optional manual "UPS
(Uninterruptible power supply unit)" or to the
manufacturer's operation manual.
Step 2-6
Replacing the internal battery
UPS operation panel
Lower right portion on the front
UPS unit
Internal battery
Internal battery
side connector
UPS side battery
connector
Battery securing fixture
Front panel
Front panel hook
Battery securing fixture
mounting screw
Front panel
mounting screws
4-5
4
Maintenance of options
3. Nozzle station
3.1
Checking the nozzle station status and cleaning the nozzle station (1 year)
When the machine is equipped with the nozzle station (option), it is necessary to periodically check the nozzle
detection sensor status.
c
CAUTION
If the nozzle station sensor cannot detect the nozzle correctly, the nozzle change does not operate correctly or the
production cannot continue due to nozzle detection error.
1
Make the preparations for work.
e
1. Return all nozzles to the nozzle station.
2. Press the emergency stop button and
then open the machine safety cover.
2
Open the shutter of the nozzle
station (hereafter referred to as
"ANC").
1. Open the [Unit] - [Head] screen.
2. Press the [Nozzle Stn Shutter] button to
open the ANC shutter.
54400-L4-10
3
Open the Utilities mode.
1. Press the [Utilities] button on the left of
the screen.
2. The "LogIn" screen will appear. Check
that "Operator" is shown in the “User”
field, and then press the [OK] button.
54402-L4-10
n
NOTE
When logging-in to the Utilities mode with "User:
Operator", the machine set values cannot be changed
or saved.
4
Select [ANC Auto].
Press the [024 ANC Auto] button.
54403-L4-00
Opening the Utilities mode
Step 3
Select [Utilities].
Select [OK] with "User: Operator".
Selecting [ANC Auto]
Step 4
Select [024 ANC Auto].
Opening the nozzle station shutter
Step 2