YS24X_Mainte_E - 第39页
Appendix 1. Specifications A-1 1.1 Air regulator unit A-1 1.2 Power connection terminals A-2 1.3 Connection between machines A-3 1.3.1 PREVIOUS INTERF ACE connector A-3 1.3.2 NEXT INTERF ACE connector A-4 2. W arranty A-…

2. UPS (Uninterruptible Power Supply) 4-4
2.1 Replacing the UPS battery (3 year) 4-4
3. Nozzle station 4-5
3.1
Checking the nozzle station status and cleaning the nozzle station (1 year)
4-5
Chapter 5 Lubrication points and schedule
1. Lubrication preparations 5-1
1.1 Compatible grease 5-1
1.2 Grease gun 5-1
2.
Lubrication points and schedule (Main machine) 5-2
2.1 X-axis 5-2
2.2 Y-axis 5-3
2.3 W-axis (U-axis) 5-4
2.3.1 Dual-stage specifications 5-4
2.3.2 Dual-lane and single-lane specifications 5-5
2.3.3. Single-lane specifications 5-6
2.4 PU-axis 5-7
2.4.1 Dual-stage specifications 5-7
2.4.2 Dual-lane specifications 5-7
2.4.3. Single-lane specifications 5-8
2.5 Head unit 5-9
Chapter 6 How to replace consumable parts
1. Nozzle 6-1
1.1 Replacing the nozzle tip and spring 6-1
1.2 Replacing the nozzle O-ring 6-2
2. Nozzle leaf springs 6-3
3. Ejector unit 6-5
3.1 Replacing an ejector bit 6-5
3.2 Replacing a valve (solenoid valve) 6-6
3.3 Replacing the cleaning blow valve 6-7
4. Conveyor 6-8
4.1 Replacing the conveyor belt 6-8

The instruction manual of this machine is written for those who operate
this machine.
Please read this manual carefully for correct operations and pay
special attention to safety precautions.
After reading through this manual, please use this manual as an
occasional reference and keep it within reach.
Introduction
Contents
1. About this manual i
2. Maintenance list ii
