YS24X_Mainte_E - 第40页

The instruction manual of this machine is written for those who operate this machine. Please read this manual carefully for correct operations and pay special attention to safety precautions. After reading through this m…

100%1 / 162
Appendix
1. Specifications A-1
1.1 Air regulator unit A-1
1.2 Power connection terminals A-2
1.3 Connection between machines A-3
1.3.1 PREVIOUS INTERFACE connector A-3
1.3.2 NEXT INTERFACE connector A-4
2. Warranty A-5
The instruction manual of this machine is written for those who operate
this machine.
Please read this manual carefully for correct operations and pay
special attention to safety precautions.
After reading through this manual, please use this manual as an
occasional reference and keep it within reach.
Introduction
Contents
1. About this manual i
2. Maintenance list ii
i
Introduction
1. About this manual
Descriptions in this manual stress important maintenance items that are essential for maintaining equipment
performance. Information given here mainly describes making inspections, cleaning and greasing as well as
procedures for replacing consumable parts in each location given in a step-by-step format. This manual is
comprised of the following chapters.
Chapter 1 Maintenance
Describes operating conditions and environments necessary to maintain the machine performance, and the importance
of the daily check work and cleaning work. Setups to make before starting maintenance work, consumable parts and
maintenance tools as well as the necessary tools are also described.
Chapter 2 Daily maintenance items
Making checks and cleaning the machine are essential daily maintenance tasks for maintaining equipment performance.
Performing these tasks prevents unforeseen trouble and allows using the machine in an optimum state.
Chapter 3 Periodic maintenance items
Describes maintenance tasks that should be performed periodically to maintain equipment performance. Includes
periodic maintenance intervals such as for "weekly", "monthly", "2-month", "3-month", "6-month", and "1-year"
maintenance tasks. In addition to inspection and cleaning, lubricate the ball screw or guide.
Chapter 4
Maintenance of options
Describes maintenance work of the YS24X main unit options (the ionizer, UPS battery and nozzle station).
For details about the optional sATSII, QFP dump station and UPS, see their respective Machine Option manuals for YS.
Chapter 5
Lubrication Points & Schedule
This section provides information regarding the lubrication points, lubrication tools, and the lubrication schedule for the
axes described in "Chapter 3 Periodic maintenance items".
Chapter 6 How to replace consumable parts
Describes methods for replacing parts subject to constant wear such as nozzle leaf springs and ejector valves.
w
WARNING
ALWAYS THOROUGHLY READ "SAFETY INSTRUCTIONS" STATED AT THE BEGINNING OF THIS DOCUMENT BEFORE STARTING
THE MAINTENANCE WORK.