JANETS_INM - 第523页

JaNets Instr ucti on Man ual 13 . Program D ownloa der 13 - 27 13.9.9.1 Speci fying a local file as the next production program T o reserve t he next pr odu ction product , select “File” – “Next pro duction pro gra m res…

100%1 / 755
JaNets Instruction Manual 13. Program Downloader
13-26
13.9.9 Next production program reservation
After the production program to be downloaded next is reserved and the uploading and
combination of the current production program is completed, the reserved production program is
automatically downloaded.
<Precautions>
[1] The next production program can be reserved only for the line that is under production by
each production program. It cannot be reserved for a line in which production has been
completed or a line in which the reserved file is under production.
[2] The number of next production programs that can be reserved is 1. It is impossible to reserve
multiple programs for a single line as a next production program.
[3] After the next production program is downloaded to one of machines of the production line,
you cannot change the setting of the “Planned No. of PWBs” of the next production program.
[4] When you open another production program, reservation information of the next
production program is deleted.
[5] When the system starts reserving the next production program for the production line, it does
not download/upload any production program to the production line that is being reserved until
the reservation is completed or canceled. It loads/unloads a production program to any
production line other than the production line that is being reserved.
JaNets Instruction Manual 13. Program Downloader
13-27
13.9.9.1 Specifying a local file as the next production program
To reserve the next production product, select “File” “Next production program reservation” in the
menu. When the dialog box for opening a file appears on the screen, select a production program
for reserving PWB production, and then click the <Open> button.
Figure 13.9-17 Next production program reservation
13.9.9.2 Specifying a file stored in a server as the next production program
Follow the procedure described in Section 13.9.1.2 “Specifying a program registered in a server
to specify an optimized production file with the Program Explorer, and then drag and drop it to the
Line Monitor.
13.9.9.3 Specifying the number of PWBs to be produced of the next production program
Since the “Set Planned No. of PWBs” dialog box appears on the screen after you specify a
production program, specify the number of PWBs to be produced.
Figure 13.9-18 Number of PWBs to be produced of the next production program
With this, the reservation of the next production program is completed. The information of the
reserved production program and the number of PWBs to be produced are displayed on the
“Production status” panel.
Figure 13.9-19 Production status panel after the next production program is reserved
JaNets Instruction Manual 13. Program Downloader
13-28
13.9.9.4 There is a difference between the production line of the specified next production
program and the active display line
If the production line of the production program to be reserved is different from the active display of
the program downloader, the error message shown in Figure 13.9-20 appears on the screen.
Figure 13.9-20 When there is a difference between the active display line
and the production line of the next production program
When this message is displayed, change the active display line over to the production line of the
production program to be reserved and then execute reserve operations of the next production
program once again.
13.9.9.5 When the next production program is already reserved
If the file is opened when the next production program is already reserved, the confirmation
message shown in Figure 13.9-21 appears on the screen.
Figure 13.9-21 When the next production program is already reserved
The existing reserve information is changed over to the newly reserved program information by
pressing “Yes.” When “No” is pressed, the reserve operations are stopped and the existing reserve
information remains saved as it is.
13.9.9.6 To change the number of PWBs to be produced of the next production program
To change the number of PWBs to be produced of the next production program, perform reserve
operations for the next production program again and set the number of PWBs to be produced
again.
13.9.9.7 Reserving the next production program by reading a serial code
By reading a serial code with a code reader, you can reserve a production program associated
with the serial code as the next production program. See Section 13.10 “Managing a Production
Program with a Serial Code” for details.
13.9.10 Registering the next reservation file
When you register a reservation file to be used for the next production, the system automatically
downloads production programs stored in the registered reservation file after production that is
being performed according to all programs of a reservation file used for production finishes.
<Precautions>
[1] You can register the next reservation file by a production line that is producing PWBs