JaNets Instr ucti on Man ual 13 . Program D ownloa der 13 - 37 If this messag e appear s on the scr een, switc h the c urrent act ive produ ction line t o a production line for a pr ogram t o be added as an a ctive dis p…

100%1 / 755
JaNets Instruction Manual 13. Program Downloader
13-36
Figure 13.9-31 “Specify a production program” screen
Select a program to be added among those displayed in the list, and then click the <OK> button.
You cannot select two or more programs. If the selected program is not checked out yet, it is
checked out before a production program is loaded to the system. When you click the <Cancel>
button, specification of the program is cancelled, and the screen is switched back to the screen for
selecting a place where a program to be added is saved.
13.9.11.4 Loading a program to be added
Load a program you want to add. The system checks an active display production line, the line
configuration and whether optimization has been conducted already. If any error occurs due to
one of these checks, the program addition processing is aborted.
Check of the active display production line
If the production line for the selected production program is different from the active display
production line of the Program Downloader, the error message shown below appears on the
screen.
Figure 13.9-32 If a production line specified with a production program is different
from the active display production line
JaNets Instruction Manual 13. Program Downloader
13-37
If this message appears on the screen, switch the current active production line to a
production line for a program to be added as an active display production line, and then
perform the program addition operation again.
<Check of the line configuration>
If the name of a production line for the selected production program is the same as that of the
current production line, but their configurations (such as the number of machines and a
machine type) are different from each other, the message shown below appears on the
screen.
Figure 13.9-33 If the production line configuration is different
If this message appears on the screen, optimize the program to be added, and then perform a
program adding operation again.
<Check to see if the selected production program is optimized>
If the selected production program is not optimized, the error message shown below appears
on the screen.
Figure 13.9-34 If the selected production program is not optimized
If this message appears on the screen, optimize a program to be added, and then perform the
program addition operation again.
13.9.11.5 Setting of the planned number of PWBs to be produced
Specify the number of PWBs to be produced. You can specify a value between 1 and 99999.
JaNets Instruction Manual 13. Program Downloader
13-38
13.9.11.6 Displaying the Program schedule list after adding a program
A program specified to be added is added to the selected position. “***” is displayed in the
“Reservation File” column fixedly, and “0” is displayed in the “Cluster” column fixedly.
Figure 13.9-35 Production schedule list displayed after a program is added
13.9.11.7 Canceling addition of a program
When you click a program whose addition you want to cancel with the mouse right button, and
then click the menu command [Cancel registration of a production program] on the displayed
menu, the selected program is deleted from the Production schedule list. You cannot cancel
addition of any production program contained in a reservation file (program whose corresponding
reservation file name is displayed in the “Reservation File” column of the Production schedule list).
In addition, you cannot cancel addition of a program whose production status is not “Unproduced”
either.
Figure 13.9-36 Canceling addition of a production program