00195760-0102_UM_D3_SR605_EN - 第192页

4 Setting up and commissioning User Manual SIPLACE D3 4.2 Infrastructure at the installation location From software version SR.605.xx 07/2008 EN Edition 192 → Crimp a ferrule o nto each end of the wire. → Loosen the nut …

100%1 / 364
User Manual SIPLACE D3 4 Setting up and commissioning
From software version SR.605.xx 07/2008 EN Edition 4.2 Infrastructure at the installation location
191
4.2.3.4 Connecting the power supply cable
4
Fig. 4.2 - 4 Terminal panel for connecting the power cable
(L1) Three-phase
(L2) Three-phase
(L3) Three-phase
(N) Neutral conductor
(PE) Protective earth wires PE1, PE2, PE3, PE4
(X100) Terminal panel
4 Setting up and commissioning User Manual SIPLACE D3
4.2 Infrastructure at the installation location From software version SR.605.xx 07/2008 EN Edition
192
Crimp a ferrule onto each end of the wire.
Loosen the nuts on the angled cable gland (item 2 in Fig. 4.2 - 3
, page 190).
Fold up the angled cable gland.
Feed the power supply cable through the angled cable gland to the terminal panel X100 (see
X100 in Fig. 4.2 - 4
, page 191).
Connect the cable to the terminal and ensure that it has a sufficient bending radius. The wires
must not be kinked.
Fold up the angled cable gland (item 2 in Fig. 4.2 - 3
, page 190) and tighten the nuts hand-
tight.
4.2.3.5 Checking connections to the primary side of the three-phase transformer T1
The primary side of the three-phase transformer T1 must be configured for the respective supply
voltage.
Therefore check at the terminal block (see Fig. 4.2 - 5
) to see whether the primary side of the
three-phase transformer T1 has been correctly connected for the respective supply voltage.
4
Fig. 4.2 - 5 Terminal block for the primary side of the three-phase transformer T1
See item 3 in Fig. 4.2 - 6, page 193 for the
position of the terminal block
User Manual SIPLACE D3 4 Setting up and commissioning
From software version SR.605.xx 07/2008 EN Edition 4.2 Infrastructure at the installation location
193
PLEASE NOTE 4
The Japanese supply network (3 x 200 VAC) and supply networks in the USA (3 x 208 VAC) are
connected to terminals for 3 x 204 VAC.
4
4
4
4
Fig. 4.2 - 6 Position of the terminal block with primary connections for the three-phase transformer T1
(1) Three-phase transformer T1
(2) Sign with the connection wiring diagram for the primary side
(3) Terminal block with primary connections for the three-phase transformer T1