EUKYX 4-5 199-2100 2.1 "Mach.Prfrm," T ab Sheet [11] [12] [13] F2D4 [ 1 1 ] Power on time Shown is the peri od of time dur in g whi ch the control po wer of the mac hine was wo rkin g. E x a m p l e: 1 0: 03 &a…

EUKYX
4-4199-2100
2.1 "Mach.Prfrm," Tab Sheet
[9] Waste components
Shown is the total number of components that were picked up but not placed.
The indicated number of components represents the components that were not placed due to a
vertical component error (sensor), a component recognition error, a component thickness error,
interrupted production, the detection (Unit PCB BBR Mode: Option) of a defective unit PCB., etc.
[10] Warm-up run(Test Md)
The data of the warm-up run (dry cycle) is counted.
PCB counter
The number of PCBs is counted when the machine is operated under the following condition.
• "Test Mode" is enabled on the "Operation" window.
• The "PCB Transfer" is set to “Disable”. (State in which no PCB is put in and out)
Not Picked Counts
The number of non-handling/non-placed actions is counted when the machine is operated
under the following condition.
• “Test Mode” is enabled on the “Operation” window.
• The "Handling/Place” is set to “Disabled" or the "Vacuum/Blower is set to
“Disabled".
The number of non-handling and placement actions is counted although the X/Y beam takes
running actions.
Note
Note

EUKYX
4-5199-2100
2.1 "Mach.Prfrm," Tab Sheet
[11]
[12]
[13]
F2D4
[11] Power on time
Shown is the period of time during which the control power of the machine was working.
Example:
10:03'50" (10 hours, 3 minutes, and 50 seconds)
Auto run time
Duration of machine operation during production. When a particular pattern program is set
several times for production, the sum total is computed.
Placement time
Shown is the time required to finish a PCB (from the first to the last component placement
on one product PCB). The essential component placement time is summed up. While the
machine is set in the "STOP" or the "PAUSE" mode or a step operation is performed, the time
is not measured. This is used to calculate the average placement tact time per component.
PCB transfer time
Shown is the period of time during which Conveyor NL, NR, NA, NB, and NC are being
activated.
PCB wait
Input wait
Shown is the period of time during which the machine was completely in the waiting mode
(the machine was waiting for a PCB to be loaded from the input machine).
Output wait
Shown is the period of time during which the machine was completely in the waiting mode
(the machine was waiting for a PCB to be unloaded to the output machine).
PEC/BBR
Shown is the period of time during which the machine is taking PEC recognition and BBR
detection actions.
Counted is the period of time during which the X/Y table starts moving and the PEC
recognition and BBR detection are completed.
Others
Shown is the period of time during which the X/Y beam takes actions before component
placement, the X/Y table returns after component placement, etc.
Note

EUKYX
4-6199-2100
2.1 "Mach.Prfrm," Tab Sheet
Stop time
Shown is the period of time during which component placement operation was interrupted
for component replenishment, etc.
Error stop
Shown is the total time period when the machine is stopped due to a machine error during
the operation or standby.
The time period of a machine error during maintenance or setup, except for automatic
operation, is not included.
Error alarm
Shown is the period of time during which an alarm (light tower ON) is issued.
Recovery
Shown is the time between error cancellation and restart of machine operation.
Maintenance time
Shown is the time period from pattern program change completion to machine status turned
to be "RUN"or "WAIT".
Feeder Reload
Shown is the machine stop time period from the occurrence of component shortage to
re-start of the machine.
Others
Shown is the time period during which the pattern program is changed or machine idling
operation is performed.
[12] Test mode time
Shown is the period of time during which test run was performed according to the test mode
parameters.
“Warm-up run time” is included.
[13] Warm-up run time
The running time is counted when the machine is operated under the following condition.
• “Test Mode” is enabled on the “Operation” window.
• The “PCB Transfer” is set to “Disable”. (State in which no PCB is put in and out)
Note
Note