EUKYX-199-2100_G5S2_Instruction_Vol2_E - 第248页
EUKYX 6-1 1 199-2100 4.1 Collecting PCB Support Pins/Setting up Conveyor Width • For Suppor t Pin Autom atic Change ( 1) Press the [Set up] butt on and [CNVR Set - up] but to n to display t he “CNVR Set - up SPRT- PINS“ …

EUKYX
6-10199-2100
4.1 Collecting PCB Support Pins/Setting up Conveyor Width
(4) Open the cover and remove the support pins.
(5) Close the cover.
(6)
Press the [Product Opn Target Pos Movement] button.
Within 10 seconds, press the [START] button on the operation panel.
(The conveyor width is changed appropriate for the selected pattern program.)
(7)
Press the [Locate] button in the “PCB Locate” group box and press the [START] button on
the operation panel within 10 seconds. (The backup base is moved up.)
POWER ON
STOP
PNL CHANGE
START
F2F10B
(8) Press the [COVER] button at the bottom of window to unlock the cover and open the cover.
(9)
Insert the PCB support pins vertically to the holes on the backup base.
(Be sure to set up the PCB support pins such that they are dispersed to support the object
PCB equally.)
Do not put your hand or any heavy object on the backup base while working on the backup
base. Otherwise, the backup base may be deformed due to an excessive load.
(10)
Confirm that a PCB support pin, etc., is not left behind on the backup base. (Confirm that
no component or dust, etc., has fallen into the holes on the backup base.)
(11) Close the cover .
(12)
Press the [Locate] button in the “PCB Locate” group box and press the [START] button on
the operation panel within 10 seconds. (The backup base is moved down.)
POWER ON
STOP
PNL CHANGE
START
F2F13
Notice

EUKYX
6-11199-2100
4.1 Collecting PCB Support Pins/Setting up Conveyor Width
• For Support Pin Automatic Change
(1)
Press the [Setup] button and [CNVR Set-up] button to display the “CNVR Set-up SPRT-PINS“
window.
MTN:NotRdy RCG:NotRdy Cover
F2F12
(2)
Press the [PCB Support Pins Exchange Pos. Movement] button.
After that, press the [START] button on the operation panel within 10 seconds. (The
machine retracts the head and maximizes the conveyor width.)
(3)
Press the [PCB Support Pins Rem./Atch. Work] button and within 10 seconds, press the
[START] button on the operation panel.
(The support pin attachment or removal will be performed automatically).
When the support pins are to be changed automatically, prepare the nozzle (PK01) in the
nozzle stocker.)
(4)
Press the [Product Opn Target Pos Movement] button and within 10 seconds, press the
[START] button on the operation panel.
(The conveyor width will be changed according to the selected pattern program).
Procedure
Note

EUKYX
6-12199-2100
4.1 Collecting PCB Support Pins/Setting up Conveyor Width
4.1.1 Notes on Attachment / Detachment of PCB Support Pins
Be sure to insert the PCB support pins at right angles.
• When a PCB support pin is inserted at the bottom side of the chute, it may collide with
the backup base while the backup base is moving up.
• If the pins are inserted improperly, the machine will break down.
Chute
PCB
Previously Placed
Component
Chute
PCB Support Pin
Backup Base
Collision!
Backup Base Up Movement
Improper Pin Insertion
F2F13
Collision!
Foreign Substance on Backup Base
Foreign Substance such
as a component trapped in the hole
F2F14
(a) When a component is trapped or dust has accumulated on the backup base, the PCB
support pins cannot be set correctly. In this case, remove the component or the dust with
a vacuum cleaner, etc. (Air Blowing Prohibited).
(b) Do not put your hand or any heavy object on the backup base while working with the
backup base. Otherwise, the backup base may be deformed due to an excessive load.
NOTICE
When some components are previously placed on the back
of the PCB, the PCB support pins must be inserted such
that they do not touch any component.
Notice
Notice