m220_383_02_process_manual工艺手册 - 第78页

OPERATION INSTRUCTIONS P ROCESS M ANU AL 5.9 Write/Edit process recipe A new process recipe needs to be written or edit ed so the desired instructions are e xecuted in the required order. A new process recipe can always …

100%1 / 91
OPERATION INSTRUCTIONS
P
ROCESS MANUAL
5.8.3
TSC-2
1) the overview screen gives an
instant view of which tubes are in
alarm in RED
2) select the desired tube from the
pull-down menu or from the
‘Overview’ screen
4)
select the ‘Alarm’ screen
3) read the alarm message(s)
4) take the appropriate action as
described in section Error!
Reference source not found.
5.8-3
OPERATION INSTRUCTIONS
P
ROCESS MANUAL
5.9 Write/Edit process recipe
A new process recipe needs to be written or edited so the desired instructions are executed in
the required order. A new process recipe can always be generated. Editing an existing and
RUNNING recipe is possible but poses considerable danger. It is therefore NOT allowed,
except when using variable commands only.
5.9.1
Touchscreen
1) return to the Main Menu by
pressing ‘ESC’ until the
following screen appears:
2) press ‘3’ to access ‘Process
Recipes’
3) enter recipe nr. to edit or ‘0’ to
create a new process recipe
followed by ‘RETURN’
4) follow instruction at the bottom
line to add or edit commands.
5.9-2
OPERATION INSTRUCTIONS
P
ROCESS MANUAL
5.9.2 TSC-2
1) return to the main overview
screen
2) select ‘Recipes’ in the
navigation bar to access the
recipe screen
3) double click ‘Normal’ or
‘Abort’ in the mainfield
4) select ‘New’ to create a new
or ‘Edit’ to edit a process
recipe
5) for a new process recipe
confirm the question: ‘Do
you want to add a new recipe’
6) give recipe name
5.9-3