00198365-03_UM_JTF-ML2_TX12_V1-V2_EN - 第5页

5 User Manual SIPLACE TX V1/V2 Series JEDEC Tray Feeder (JTF-ML2) 11/2019 Contents 5.3.6 JEDEC Tray Feeder Settings – Functions .. 78 5.3.6.1 Position Correction .. 80 5.3.6.2 Switching to Level View .. 80 6 Mainte…

100%1 / 94
4 User Manual SIPLACE TX V1/V2 Series JEDEC Tray Feeder (JTF-ML2) 11/2019
Contents
3 Technical data of the module.. 25
3.1 Technical data.. 26
3.2 Overview – SIPLACE JTF-ML2.. 27
4 Setting up and commissioning.. 29
4.1 Requirements and restrictions.. 29
4.2 Retrofitting in the SIPLACE TX-Series.. 30
4.2.1 Scope of delivery for retrofitting in the SIPLACE TX-Series V1.. 30
4.2.1.1 Overview of Parts.. 30
4.2.2 Scope of delivery for retrofitting in the SIPLACE TX-Series V2.. 32
4.2.2.1 Overview of Parts.. 32
4.2.3 Tools and equipment required.. 33
4.2.4 Required working time.. 33
4.2.5 Performing retrofitting.. 34
4.2.5.1 Preparatory steps.. 34
4.2.5.2 Converting the COT insert for the SIPLACE TX.. 34
4.2.5.3 Converting the machine protection.. 41
4.2.5.4 Fitting the SIPLACE JTF-ML2 adapter.. 44
4.2.5.5 Fitting the machine protective features.. 44
4.2.5.6 Mounting the output conveyor extension.. 46
4.2.5.7 Mounting the tower.. 46
4.2.5.8 Mounting the conveyor.. 48
4.2.5.9 Establishing the electrical connections on the SIPLACE TX-Series V1.. 50
4.2.5.10 Establishing the electrical connections on the SIPLACE TX-Series V2.. 54
4.2.5.11 Preparing the component trolley.. 57
4.2.5.12 Completing the mechanical work.. 57
4.2.5.13 Logging the SIPACE JTF-ML2 in at the software.. 57
4.2.5.14 Teaching the transfer position.. 58
4.2.5.15 Teaching the refill position.. 60
4.3 Configuration of JEDEC tray feeders in SIPLACE Pro.. 62
4.3.1 SIPLACE JTF‑ML2 in SIPLACE Pro – Feeder Tree View.. 62
4.3.2 JEDEC Tray Description – Tray Tree View.. 62
4.3.3 Configuration of the station – Station Tree View.. 63
4.3.4 Assignment of JEDEC Tray to the Component Shape – Component Shape Tree View.. 64
4.3.5 Configuration of the setup – Setup Tree View.. 65
4.3.5.1 Head Configurations on the SIPLACE TX 1 and TX2.. 65
4.3.5.2 Table Configuration.. 65
4.3.5.3 Configuring the JEDEC Tray Feeder on the Table.. 66
5 Tasks on the machine.. 67
5.1 Displays.. 67
5.2 Task: Operating the feeder.. 67
5.2.1 Locking and unlocking the transportation lock.. 67
5.2.2 Locking and unlocking the direction lock.. 68
5.2.3 Pushing trays into and removing from the cassette.. 69
5.2.4 Removing the cassette from the SIPLACE JTF-ML2.. 71
5.2.5 Inserting the cassette into the SIPLACE JTF-ML2.. 73
5.3 Operating the JEDEC tray feeder in the station software.. 75
5.3.1 JEDEC Tray Feeder Configured in SIPLACE Pro and Defined at the Machine.. 75
5.3.2 "Display, Check and Set up Feeders, Components and Nozzles" Menu.. 76
5.3.3 Selecting the JEDEC Tray Feeder at the Location.. 76
5.3.4 SIPLACEJTF-ML2 – Additional Functions.. 77
5.3.5 JEDEC Tray Feeder Settings.. 78
5User Manual SIPLACE TX V1/V2 Series JEDEC Tray Feeder (JTF-ML2) 11/2019
Contents
5.3.6 JEDEC Tray Feeder Settings – Functions.. 78
5.3.6.1 Position Correction.. 80
5.3.6.2 Switching to Level View.. 80
6 Maintenance.. 83
6.1 Overview maintenance tasks.. 83
7 Appendix.. 85
7.1 Excerpts from the Service Manual.. 85
7.1.1 Replacing the Feeder Control Unit (FCU).. 85
7.1.1.1 Board description Feeder Control Unit (FCU).. 87
7.1.2 Nozzle Changer Setting.. 89
7.1.2.1 Setting the nozzle changer height.. 89
7.1.2.2 Setting the Nozzle Station Height.. 90
7.1.2.3 Jumpers on the Nozzle Changer.. 91
6 User Manual SIPLACE TX V1/V2 Series JEDEC Tray Feeder (JTF-ML2) 11/2019
Contents