00198352-01_AI_Conveyor_Conversion_Kit_E-by-SIPLACE_EN
E by SIPLACE Conveyor Conversion Kit Right to Left and Left to Right Assembly Instructions Edition 03/2017 EN

E by SIPLACE
Conveyor Conversion Kit
Right to Left and Left to Right
Assembly Instructions
Edition 03/2017 EN

All names identified by ® are registered trademarks of ASM Assembly Systems GmbH & Co. KG. The remaining
trademarks in this publication may be trademarks whose use by third parties for their own purposes could violate
the rights of the owner.
We have reviewed the contents of this publication to ensure consistency with the hardware and software de-
scribed. Since variance cannot be precluded entirely, we cannot guarantee full consistency. However, the informa-
tion in this publication is reviewed regularly and any necessary connections are included in subsequent editions.
Copyright © ASM Assembly Systems Technical data subject to change
ASM Assembly Systems Singapore Pte Ltd
535 Yishun Industrial Park A
ASM Tech-Park Building 2
Singapore 768775
Item no.: 00198352-01
www.e-by-siplace.com Printed by ASM Assembly Systems
3
Assembly Instructions E by SIPLACE
Conveyor Conversion Kit 03/2017
Content
Content
1
Introduction.. 5
1.1 Safety Instructions.. 5
1.1.1 Conventions for the Use of Safety Instructions and Symbols
.. 5
1.1.2 Safety Instructions for Working with Strong Magnetic Fields.. 6
1.1.3 Safety Instructions for the Power Supply.. 6
1.1.4 Safety Instructions for the Gantry.. 7
1.2 Preparatory Work..... 7
1.3 Other Instructions.. 9
1.3.1 Environmentally-Friendly Disposal of Materials and Components.. 9
1.3.2 Use of Original SIPLACE Accessories and Spare Parts.. 9
1.3.3 ESD Guidelines.. 9
1.3.3.1 Definition of ESD.. 9
1.3.3.2 Important Measures to Protect Against Static Charging.. 9
1.3.3.3 Handling ESD Modules.. 10
1.3.3.4 Measurements and Modifications to ESD Modules.. 10
1.3.3.5 Dispatching ESD Modules.. 10
1.3.4 Release History.. 10
1.4 Staff Qualifications and Training.. 11
2 Conversion.. 13
2.1 Tools and parts required.. 13
2.2 BOM Identification.. 13
2.3 Steps and procedure.. 13
3 Cable harness for the LBO E 1030 and 1200.. 19
3.1 Standard flow (Right Fix, Single Line Connections).. 20
3.2 Reverse flow (Left Fix, Single Line Connections).. 21
3.3 Standard flow (Right Fix, Multi Line Connections).. 22
3.4 Reverse flow (Left Fix, Multi Line Connections).. 23
4 Software Installation.. 25
4.1 SIRIO Station Software Re-Installation after Hardware Conversion.. 25
4.2 Stopper and Board sensor functional check.. 25
4.3 SIPLACE Pro Machine and Line Configuration Setup.. 27
5 Final Checklist.. 29