4 Software Installation 4.2 Stopper and Board sensor functional check Assembly Instructions E by SIPLACE Conveyor Conversion Kit 03/2017 26 Fig.16: Checking stoppers All stopper activated with red indication.  NOTICE! …

100%1 / 32
Assembly Instructions E by SIPLACE
Conveyor Conversion Kit 03/2017
4 Software Installation
4.1 SIRIO Station Software Re-Installation after Hardware Conversion
25
4 Software Installation
4.1 SIRIO Station Software Re-Installation after Hardware
Conversion
After the conveyor hardware kit conversion has been done. The SIRIO station must be re-installed
so that the correct configuration files are running on the machine.
For Right fixed E-machine, select machine type E1R during SIRIO station software installa-
tion.
For Left fixed E-machine, select machine type E1L during SIRIO station software installation.
Refer to SIRIO installation guideline for software installation.
4.2 Stopper and Board sensor functional check
Manual functional check on the stopper and board sensor condition after software installation:
Fig.14: Conveyor inputs/outputs
Go to Conveyor inputs/outputs function.
Fig.15: Example of a machine with both LBO 700 and 1200 mm
stopper installed
Enable stopper function for all available stopper
selection.
4 Software Installation
4.2 Stopper and Board sensor functional check
Assembly Instructions E by SIPLACE
Conveyor Conversion Kit 03/2017
26
Fig.16: Checking stoppers
All stopper activated with red indication.
 NOTICE!
Check and confirm that the stopper units on
the stopper set are in extended up position
according to the right sequence.
.
If any stopper does not activate when enabled,
check the wiring connection and stopper condi-
tion.
Fig.17: Checking board sensors
Check board sensor condition.
Go to Lane selection.
Fig.18: Board sensor condition without PCB
Fig.19: Board sensor condition when sensor is covered by
PCBs
Perform complete machine calibration and mapping for machine after all stoppers and board
sensors are in good working condition.
Assembly Instructions E by SIPLACE
Conveyor Conversion Kit 03/2017
4 Software Installation
4.3 SIPLACE Pro Machine and Line Configuration Setup
27
4.3 SIPLACE Pro Machine and Line Configuration Setup
After hardware conversion, SIRIO station software and Machine calibration proceed with machine
and line configuration on SIPLACE Pro:
Fig.20: New Station
Step 1:
Under station line tree view select New Station.
Fig.21: Select conveyor type
Step 2:
Select SIPLACE E1 R for right fixed conveyor.
Select SIPLACE E1 L for left fixed conveyor.
Fig.22: Object Properties
Step 3:
Input the machine IP address, Host name.
Choose Default station configuration (Speed
or Flexible) and Software version.