KE2040Instruction Manual Ver2.01,REV04.2003.6.25 - 第583页
7 − 101 Ⅱ Ⅱ Ⅱ Ⅱ When there is no conti nuous production fi le Step No. Production operation Wh ether a board is located on the PWB transport path Information on the PW B transport path obtained when production was interr…

7 − 100
− When you execute the selection described above, the system displays the
“Re-clamp” dialog box, and executes a new PWB production or resumes the
current production without loading any board before starting production.
Some component(s) may not be placed on a board or may be placed at a wrong
position during new production or resumed production after the board is clamped
again. Be careful to start production.
Step ⑮
⑮⑮
⑮.
When a board is located on the PWB transport path, and the system obtains no PWB
transport path information when production is interrupted
When you select “Produce newly.” and “Re-clamp current PWB”, the system displays
the following PWB transport path condition:
Figure 7.4.14.1.5 ⑩
⑩⑩
⑩ Condition of the PWB transport path
− When you execute the selection described above, the “Re-clamp” dialog box
appears on the screen. After clamping a board again, the system resumes the
production without loading a board before starting production.
In this case, since the system obtains no PWB transport path information when
production is interrupted, some component(s) may not be placed on the clamped
board or may be placed at a wrong position of the board when it starts new
production or continue the production. after clamping the board. Be careful to
produce a PWB.
Step ⑯
⑯⑯
⑯.
When there is no board on the PWB transport path and the PWB transport path
information indicates that there is a board on the path
When you select “Produce newly.” and “Re-clamp current PWB”, the screen shows
the following PWB transport path condition:
Figure 7.4.14.1.5 ⑪
⑪⑪
⑪ Condition of the PWB transport path
− When you execute the selection described above, it causes an error since there is
no board on the PWB transport path.

7 − 101
Ⅱ
ⅡⅡ
Ⅱ When there is no continuous production file
Step
No.
Production
operation
Whether a
board is
located on the
PWB
transport path
Information on
the PWB
transport path
obtained when
production was
interrupted
Operation after you press
the <START> key
① Yes
A board is located
on the path.
The radio button “Load a new PWB.” is not
selectable.
② Yes No board
After ejecting a board, the system loads a new board
before start of production, and then starts a new
production or resumes the current production.
③ Yes No information
After ejecting a board, the system loads a new board
before start of production, and then starts a new
production or resumes the current production (Be
careful to start production).
④ None
A board is located
on the path.
⑤ None No board
The system starts a new production or resumes the
current production.
⑥
Production
after a board
is loaded
(when you
select “Load
a new
PWB.”)
None No information
The “Processing before production begins” dialog box
does not appear on the screen.
(The system starts a new production or resumes the
current production immediately.)
⑦ Yes
A board is located
on the path.
After clamping a board again, the system starts new
production or resumes the current production without
loading any board before starting production.
⑧ Yes No board
The radio button “Re-clamp current PWB” is not
selectable.
⑨ Yes No information
After clamping a board again, the system starts new
production or resumes the current production without
loading any board before starting production. (Be
careful to start production.)
⑩ None
A board is located
on the path.
⑪ None No board
An error (There is no board.)
⑫
Production
after a board
is clamped
again (when
you select
“Re-clamp
current
PWB”)
None No information
The “Processing before production begins” dialog box
does not appear on the screen.
(The system starts new production or resumes the
current production immediately.)
Step ①
①①
①.
When there is a board on the PWB transport path and the PWB transport path
information indicates that there is a board on the path when production is interrupted
You cannot select the radio button “Load a new PWB.”.

7 − 102
Step ②
②②
②.
When there is a board on the PWB transport path and the PWB transport path
information indicates that there is no board on the path
When you select “Load a new PWB.”, the screen shows the following PWB transport
path condition:
Figure 7.4.14.1.6 ①
①①
① Condition of the PWB transport path
− When you execute the selection described above, the “PWB ejecting” dialog box
appears on the screen. After ejecting a board, the system loads a new board
before starting production, and then starts a new production or resumes the
current production.
Since the system obtains the PWB transport path information when production is
interrupted, it functions with assuming that there is a board produced by the
previous production on the PWB transport path.
Step ③
③③
③.
When there is a board on the PWB transport path and the system has no PWB
transport path information obtained when production is interrupted
When you select the radio button “Load a new PWB.”, the screen shows the following
PWB transport path condition:
Figure 7.4.14.1.6 ②
②②
②
− When you execute the selection described above, the “PWB ejecting” dialog box
appears on the screen. After ejecting a board, the system loads a new board
before starting production, and starts new production or resumes the current
production.
In this case, since the system obtains the PWB transport path information when
production is interrupted, it functions with assuming that there is a board produced
by the previous production on the PWB transport path. Check the ejected board
carefully because some component may not be placed on it.