KE2010.Instruction Manual.Ver.2.01,Rev.08 - 第439页

6 − 63 If you check both of the check boxes “Re- measure component height when components run out. ” and “The verificat ion inspecti on is done on restart component run out. ” on the Product ion (Pause) tab invoked from …

100%1 / 1361
6 62
Figure 6.4.1.2 "Question" dialog box
When you click the <Yes> button, the system remeasures a component fed by a
feeder which failed to be measured.
When you click the <No> button, the system measures the height of a component
fed by the next feeder whose stocked components run out, or tries to restart
production.
In the same manner, when you check the check box “The verification inspection is
done on restart component run out.” on the Production (Pause) tab invoked from
the Operation option dialog box, the machine restarts production after performing
verification check for a chip or MELF component that runs out.
If the machine fails to perform a verification check, the dialog box shown in
Figure 6.4.1.2.1 appears on the screen.
Figure 6.4.1.2.1 Question dialog box
When you click the <Yes> button, the system re-checks components of a feeder
that failed to be checked.
When you click the <No> button, the system performs a verification check for
components fed by the next feeder whose stocked components run out, or tries to
restart production.
6 63
If you check both of the check boxes “Re-measure component height
when components run out. and “The verification inspection is done
on restart component run out.on the Production (Pause) tab invoked
from the Operation option dialog box, the system measures the height of all
applicable components, and then performs a verification check.
It does not measure the component height and performs a verification
check alternately.
The system does not perform a verification check for a component whose
height fails to be measured.
When you check the check box “The SOT direction inspection is done on restart,
when component run out.” on the Operation option menu in the same manner, the
machine checks the direction of an SOT component that caused a
component-run-out error, and resumes the suspended production.
If the machine fails to check the direction of an SOT component, the message
shown in Figure 6.4.1.2.2 appears on the screen.
Figure 6.4.1.2.2 Question dialog box
When you click the <Yes> button, the machine checks a component supplied
by a feeder that the machine failed to check again.
When you click the <No> button, the machine checks the direction of an SOT
component supplied by the next feeder whose stocked components run out,
or resumes the suspended production.
Note: If you check both of the check boxes “Re-measure component height when
components run out and “The SOT direction inspection is done on restart,
when component run out, the machine checks the direction of an SOT
component after measuring the height of all components that are set to be
measured. The machine does not measure the height of a component,
and then the direction of an SOT component alternately. The machine
does not perform a SOT check for a component that it failed to measure
even though the direction of the component is set to be checked.
6 64
In the same manner, when the Operation option “Pick and trace before retry.” is
checked, the system picks up a component and tracks this picking-up operation
according to the specified requirements before resuming the suspended
production. Before picking up and tracking a component, the “Auto Pick Trace
Set” dialog box appears on the screen as shown in Figure 6.4.1.3.
Figure 6.4.1.3 “Auto Pick Trace Set” dialog box
Enter the maximum length of the shorter side of a component to be picked up/tracked
in the input area. The system will not pick up and track a component whose shorter
side is longer than the value you specified here.
When you press the <START> switch, the system picks up and tracks a component,
and then resumes the suspended production. When you press the <STOP> switch,
the system enters Pause mode again.
The combo box displayed on the dialog box above indicates the setting of the
Operation option, and you cannot change or select it.
Production restart mode
How production restarts when the <START> switch on the operation panel is
pressed differs as shown below, depending on the selection of the radio
button on the dialog box.
Restart mode Operation when production is restarted
Retry Searches all alternative feeders for the runout components, and if all the feeders have run out
of the components, all the feeders are fully loaded with the components. Then, operation
restarts from the current pick and placement cycle.
Skip Skips the components which have been run out, and production starts from the next pick
cycle.