00193431-03 - 第27页
HS-50 Modification Long Board Option 2 Assembly instructions Long Board Option SIPLACE HS-50 03/2007 Edition 27 2.5 Hardware : Switch the placement system off at the main switch. 2 Follow the correct shut-do wn routine. …

2 Assembly instructions Long Board Option SIPLACE HS-50 HS-50 Modification Long Board Option
03/2007 Edition
26
2.4 Safety instructions
WARNING
Comply with the higher ranking "Safety Instructions" in Chapter "Operational Safety" in the User
Manual and Service Manual. 2
The placement machines SIPLACE are powered by mains voltage.
Portions of the system are therefore conducting dangerous electricity, inside the machine even
while the master switch is turned off.
Death, serious injury or considerable damage may result if these automatic placement systems
are handled incorrectly.
After you have properly carried out the shut-down of the operating system:
Before all work the machine must be turned off at the main switch and isolated from the mains. In
addition, the compressed air supply must be turned off at the main valve of the compressed air
unit in the machine base and the compressed air lines must be bled by actuating the needle valve
at the compressed air unit.
Danger: For anyone wearing a heart pacemaker it is not permitted to work near linear motors, as
described in detail in the User Manual and the Service Manual, Chapter "Special Safety Instruc-
tions when working in vivinty of powerful magnetic fields" .
Obey the applicable accident prevention regulations, DIN standards and special safety codes of
your country at all times. DIN EN 60204 must be adhered to during all work inside the machine
base.
Follow the instructions regarding residual voltages in Chapter "Operational Safety".
Comply with regulations on ESDs (see Chapter "Operational Safety").
During the work of assembly secure the machine conscientiously against other personnel and pre-
vent it from being turned back on without authorization, as described in the User Manual in the
chapter "Locking the Machine...".
There is additional, higher risk of accident when working with the SITEST program.
The SITEST program is only to be started by personnel who are authorized to do so. 2
2
2.4.1 Definitions
2
Please note 2
2
2
2
Caution 2

HS-50 Modification Long Board Option 2 Assembly instructions Long Board Option SIPLACE HS-50
03/2007 Edition
27
2.5 Hardware
: Switch the placement system off at the main switch.
2
Follow the correct shut-down routine. 2
2
2
2
Follow the ESD regulations! 2
2
: Open the protective hoods on the output side.
: Remove the transmission lever that clamps the PCB when the lifting table is raised.
: Remove the lifting table.
2
The cable for the stopper BEROs is fixed with quick-drying adhesive. Make sure that you do not
damage the cable insulation when you remove the cable. 2
2
: Loosen the screw used to fix the BERO (see diagram below).
: Unscrew the plate on the side of the BERO.
2
2
: Unplug three cables (2x BERO, 1x valve connection) and one air hose.
: Fold down the power chain as a retainer.

2 Assembly instructions Long Board Option SIPLACE HS-50 HS-50 Modification Long Board Option
03/2007 Edition
28
: Remove the two screws on the guide pillars.
2
: Push the guide pillars to the right (viewed in the transport direction).
2
2
: Remove the old stopper. This is no longer required.
: Push the new stopper unit for long PCBs onto the pillars, and fix the pillars in place once more.
2
The stopper BERO must not be activated when the stopper is retracted. 2
2
Screws on the
guide pillars
Transport direction
Guide pillars