3-11 3 Periodic maintenance items 2. Monthly inspection 2.1 Cleaning the nozzle air path Clean the nozzle air path if a nozzle clogging is found in the daily inspection or every month. e 1 Remo ve the nozzle from the hea…

100%1 / 141
3-10
3
Periodic maintenance items
1.4 Checking the board clamp condition and operation
1.4.1 Checking the board clamp condition
Check the board clamp condition at least once a week when a production type is changed or even when a
production type change is not performed.
1. When the board is clamped, no backlash is found.
2. There is no clearance between the board and the
board hold plate when the board is clamped.
3. The board is flush with the upper surface of the
conveyor rails when the board clamp is raised.
4. The board clamp unit moves smoothly.
53306-L1-10
n
NOTE
If either of 1 to 3 or all of 1 to 3 are result in failure,
check that the board hold plate, the push-up pin
quantity and positions are correct. If the mounting
screws of the board hold plate are loosened, tighten
them. If 4 is result in failure, check the clamp unit
operation with the procedure on the next page.
1.4.2 Checking the board clamp operation
e
1
Prepare for maintenance work.
1. Press the emergency stop button and
then open the machine safety cover.
2. If the machine is equipped with a
carriage, remove the carriage for easy
access to the conveyor.
2
Move the clamp board up.
1. While there is no board in the conveyor,
press the [Board Clamp] button in the
[Unit] – [Conveyor] screen.
2. Visually check the clamp board moves
up smoothly without deviation.
54318-L1-00
3
Move the clamp board down.
1. Press the [Board Clamp] button again to
move the clamp board down.
2. Visually check the clamp board moves
down smoothly without deviation.
4
Repeat the clamp operation.
Repeat Step 2 and 3 to check the clamp
operation is stable.
n
NOTE
If an error is found in board clamp operation, contact
YAMAHA sales representative.
Checking the clamp condition
Check that no gap between the board
and board hold plate is found.
Board is flush with the conveyor rails.
Clamp and unclamp the
board to check the
movement
Checking the board clamp operation
Step 2-4
[Board Clamp] button
Shall move up and down smoothly
Shall be no deviation between
right and left
Board clamp plate
3-11
3
Periodic maintenance items
2. Monthly inspection
2.1 Cleaning the nozzle air path
Clean the nozzle air path if a nozzle clogging is found in the daily inspection or every month.
e
1
Remove the nozzle from the head.
1. Press the emergency stop button and
then open the machine safety cover.
2. Remove the nozzle from the head. If the
machine is equipped with the nozzle
station, press the [Nozzle Stn Shutter]
button to open the nozzle station shutter
and remove the nozzle.
2
Blow air through the nozzle.
Using an air blow tool, blow air through the
nozzle from the nozzle tip and then from the
other end.
53307-L1-00
n
NOTE
If there are dirt deposits in the nozzle, perform steps 3
and 4.
3
Clean the nozzle hole.
Pass the nozzle cleaning wire through the
nozzle hole and clean the nozzle hole. While
holding both ends of the wire with fingers or
using a custom handle (option) shown in the
figure on the right, gently move the nozzle
back and forth.
53308-L1-00
4
Blow air through the nozzle.
After removing the cleaning wire, blow air
through the nozzle with the air blow tool, just
as in step 2.
53309-L1-00
5
Return the nozzle to its original
head.
n
NOTE
If removed nozzles from the nozzle station, return them
to the nozzle storage positions.
Air blow
Step 2
Air tube (black)
Air blow tool
(option)
Air tube (orange) connected to
air supply port
Insert the
nozzle tip into
the air tube and
blow air.
Blow air from the
nozzle attachment
side.
Cleaning a nozzle
Step 3
Custom
handle
(option)
Nozzle
Nozzle cleaning wire
Air blow
Step 4
NozzleAir blow tool (option)
3-12
3
Periodic maintenance items
2.2 Cleaning FNC nozzles
2.2.1 Removing FNC nozzle assembly
This section describes how to clean the FNC nozzle.
1
Perform return-to-origin.
Check safety and press the [Origin] button
on the Setup screen.
2
Replace to the middle noise.
Among the three types of nozzles attached
to the FNC head, set the middle nozzle.
On the [Unit] – [Head] screen, press the
[Nozzle Change] button, and replace all
FNC heads (Head 2, 4, 6, and 8) with the
“Type – 302F (312F, 313F)” nozzles.
n
NOTE
Depending on the machine specification, the middle
nozzle type changes. Please check the specification
beforehand.
e
3
Move the head toward you.
1. Press the emergency stop button and
then open the machine safety cover.
2. Move the head unit forward.
4
Slide the stopper block outward.
1. Loosen the bolt mounting the stopper
block with the M1.5 hex wrench.
53310-L1-00
2. Slide the stopper block by pushing on
one end of it.
53311-L1-00
5
Pull out the FNC nozzle shaft.
While gripping the nozzle assembly, pull out
the FNC nozzle shaft horizontally along with
the bevel gear.
53312-L1-00
Loosening the bolt securing the stopper block
Step 4-1
Hex wrench (1.5)
Stopper block
Sliding the stopper block outward
Step 4-2
Slide the stopper block outward.
Pulling out the FNC nozzle shaft
Step 5
Pull the bevel gear and shaft.