00192299-02 - 第82页

2 Retrofitting Instructions: Mechanical Ceramic Substrate Centering HS -50 SIPLACE HS -50 2.5 Sequence of Retrofitt ing 01/01 Issue 82 During th is proces s, inse rt the 2 s ocket hex head ca p screw s M4 x 45 from above…

100%1 / 124
SIPLACE HS-50 2 Retrofitting Instructions: Mechanical Ceramic Substrate Centering HS-50
01/01 Issue 2.5 Sequence of Retrofitting
81
 $V VHPEOLQJWKH&H UDPLF6XEVW UDWH &HQWHULQJ8QLW
Å Install the mechanical ceramic substrate centering unit on the fixed conveyor side.
The pins on the bottom of the body of this unit have to fit into the centering holes in the lifting
table plate.
.H\
1. Lifting table plate
2. Mechanical ceramic substrate centering unit
3. 2 socket hex head cap screws M4 x 45
4. Holes for fastening screws (in the body of the centering unit)
5. Connection for pneumatic hose and restrictor (opening speed)
6. Proximity switch
7. Proximity switch cable with connector
8. Flat cylinder of compressed air, with tension spring
Å Move the X-slide unit such that the holes in the body of the centering unit are accessible one
after the other.
2 Retrofitting Instructions: Mechanical Ceramic Substrate Centering HS-50 SIPLACE HS-50
2.5 Sequence of Retrofitting 01/01 Issue
82
During this process, insert the 2 socket hex head cap screws M4 x 45 from above (see Fig.
2.5.4 -> 3, 4).
Å Use them to bolt the body of the centering unit onto the lifting table.
Å Adapt the X-centering unit to the substrate size to be handled next (see Section 2.5.9).
 6HWWLQJWKH2SHUDWLQJ'LVWDQFHRIWKH3UR[LPLW\6ZLWFK
Å Make certain that the operating surface of the inductive proximity switch is set 0.2 mm back
from the stop surface of the slide unit in the hole.
This precludes the possibility that the proximity switch might serve as a stop during the opening
movement and being damaged as a result.
Å If necessary, correct the position of the proximity switch (grub screw, size 1 Allen wrench).
The proximity switch has an LED for checking the switching process.
 $GDSWLQJWRWKH6XEVWUDWH6L]H
To ensure the 3-point contact of the substrate for the centering unit in the X-direction, the ceramic
substrate centering unit has to be adapted to the substrate size to be processed afterwards.
To do this, install the pertinent stop rail (with 2 ball bearings) and the pertinent stop unit (with sta-
tionary roller AND distance bolt) -> Item no. see table below.
CAUTION
The distance bolt ist not to remove ! .
Designation For substrate width Item no.
Stop rail 1 assembly
with parallel pin
for 50 mm to 62 mm 00358877-01
Stop rail 2 assembly for > 62 mm to 106 mm 00358884-01
Stop rail 3 assembly for > 106 mm to 140 mm 00358885-01
Stop unit kit 1 (complete
with distance bolt)
for 50 mm to 62 mm 00358874-01
Stop unit kit 2 (complete
with distance bolt)
for > 62 mm to 106 mm 00358875-01
Stop unit kit 3 (complete
with distance bolt)
for > 106 mm to 140 mm 00358876-01
SIPLACE HS-50 2 Retrofitting Instructions: Mechanical Ceramic Substrate Centering HS-50
01/01 Issue 2.5 Sequence of Retrofitting
83
Å On the X-slide unit loosen the stop rail assembly fasteners (2 socket hex head cap screws
M 3: see Fig. 2.5.6 -> 4, 5).
Å Mount the required stop rail assembly (see table above and Fig. 2.5.5).
1. Stop unit Kit
, fixed stop
2. Stop unit Kit
, fixed stop
3. Stop unit Kit
, fixed stop
4. Stop rail
DQG
, assembly (see
PDUNVDQG
), movable stop
5. Parallel pin to limit the lift:
Must be on stop rail 1.
NOTE:
Install the stop unit kit 1 (fixed stop) and stop rail "", assembly (= movable stop) for substrates
PPWRPPZLGHWKDWDUHPRUHWKDQPPORQJ(e. g., twice as long): See table above
and Fig. 2.5.5).