00196430-0102-AI_Head_Reconfiguration_Kit_SX_CPP_en_de - 第49页

Brief Description Options for CPP Tools and Equipment Required Assembly Instructions / Montageanleitung Head Reconfiguration K it CPP 49 Tools and Equipment Required 2.2 Tools and Equipment Required Designation Item No. …

100%1 / 78
Brief Description
Scope of Delivery Options for CPP
48 Assembly Instructions / Montageanleitung Head Reconfiguration Kit CPP
2.1.2 Additional Parts Set TwinHead to CPx
Options for CPP
2.1.3 Options for CPP
1 x 03055516-xx PCB / B-Base adapter C+P
8 x 03042541-xx ISO4762-M3x6-A2-70
2 x 03069093-xx ISO 4762 - M 3 x 50-8.8, zinc, TFP
1 x 03048638-xx Bin
4 x 03062378-xx Component reject bin up to 6x6 f. P001
1 x 03073328-xx Nozzle station CPx cplt. / X, B Series
3 x 030395514-xx Shim plate for nozzle reject device
1 x
includes:
03051467-xx Piping of nozzle station / with valve
1 x 03055785-xx Valve for nozzle station cplt.
2 x 00350291-xx DIN912-M2.5 x 16-A2-70
1 x 03055792-xx Press-fit connection with push-on socket QSY-6H-4
1 x 00330249-xx Plug QSC-4H
1 x 03056097-xx PUN-CM 4x0.75 / 135mm
1 x 03056096-xx PUN-CM 4x0.75 / 200mm
00519841-xx Nozzle changer CPP SX1/2
00519842-xx Nozzle changer CPP SX1/2 (Pos.3o.4)
00519902-xx Stationary camera for CPP head, SX1/2
00519848-xx Verify reject bin, SX1/2
03071171-xx Starter kit for maintenance CPx and TwinHead
03076791-xx Service box nozzle 20-Segm. CPP Head
Brief Description
Options for CPP Tools and Equipment Required
Assembly Instructions / Montageanleitung Head Reconfiguration Kit CPP 49
Tools and Equipment Required
2.2 Tools and Equipment Required
Designation Item No.
Torque wrench 03078400-xx (old version: 00376504-xx)
Extension with joint (170 x SK3) 03042635-xx
Extension straight (170 x SK3) 03043440-xx
Tool extension straight TX20 03073256-xx
Bit holder for TorqueVario screwdriver 03078706-xx
Depth measuring gauge 200 mm 03079617-xx
Pressure test device with measurement cable 00313523-xx
Conversion kit COT insert X 00378465-xx
Mapping Plate SX 560x460 Set
or
Alu Mapping Plate 560 x 460 D, SX1/2
03076118-xx
03076765-xx
Calibration tool version 3 CPP 03010565-xx
Calibration tool version SST23 C&P20 03034148-xx
Assembly Instructions Stationary Camera SX Series 00196608-xx
Assem Assembly Intructions SIPLACE SX 1/2 Noz
-
zle Changer
00196578-xx
Assembly Instructions Reject Bin SIPLACE SX Se
-
ries
00196615-xx
Assembly Instructions Stationary Camera Type 25
SIPLACE X Series, SX1/2, D3 and D1
00194554-xx
Service Manual SX1/2 00196496-xx
Brief Description
Requirements and Restrictions for the CPP Placement Head Reconfiguration Duration
50 Assembly Instructions / Montageanleitung Head Reconfiguration Kit CPP
Requirements and Restrictions for the CPP Placement Head
2.3 Requirements and Restrictions for the CPP Placement Head
The camera type is added during the configuration query of the head reconfiguration kit. The C&P
component camera (type 29) 27x27 digital RK [03018637-xx] is the default.
[03018637-xx] C&P component camera (type 29) 27x27 digital RK (default)
[00119783-xx] CPP head camera (01005) (type 38)
In a placement area with 2 gantries the CPP heads may only be installed on the same height. Thus,
both CPP heads have to be installed in either the high or the low position.
If the CPP head is used together with a TwinHead in a placement area with 2 gantries, the CPP head
may only be installed in the high position.
When using third party feeder modules pay particular attention on the crash danger.
It is not possible to use a vacuum pump together with a CPP head. The head principle requires a
compressed air supply for the time being.
During the placement of a PCB no nozzle change is executed with CPP heads (applies to old modes:
C&P, P&P and Mixed).
In conjunction with a stationary camera the CPP head must always be installed in the high position
and the stationary camera in the low position.
The CPP head can only be used with stationary cameras of function status -04 or higher.
When using a CPP head no magazines of the C&P20A head are allowed on the nozzle changer.
This is monitored by the software.
Reconfiguration Duration
2.3.1 Reconfiguration Duration
The following reconfiguration durations per head can be expected:
Placement head Single-/Double conveyor Task
Disassembling CPP 20 min Without options such as nozzle changers, verify
component reject bin and stationary camera
Disassembling
C&P20A
20 min Without options such as nozzle changer, verify
component reject bin
Disassembling Twin
-
Head
30 min Verify Component reject bin
Assembling CPP 90 / 120 min With mapping and without options such as nozzle
changer, verify component reject bin and stationary
camera
Assembling C&P20A 90 / 120 min With mapping and without options such as nozzle
changer, query component reject bin
Assembling Twin
-
Head
90 / 120 min With mapping and without options such as nozzle
changer, verify component reject bin and stationary
camera