Maintenance Manual - 第170页
RL131 MAINTENANCE MANUAL 7.8 Pneum atic Unit DA8MEC-Z0-300-A 0 7.8-1 7.8. Pneumatic Unit DA8MEC-Z0-300-A0 7.8.1 Cut Waste B ottle and Tap e Waste Rece ptacle Unit No. N610077282AA / N610070 306AA Inspection Period No. …

RL131
MAINTENANCE MANUAL
7.7 Anvil Unit
DA8MEC-Z4-400-A0
7.7-6
12. Turn the plug of the reduction gear clockwise to retighten.
13. Retighten the screws and reattach the belt cover.
14. Retighten the screws of the front center cover and lock it in place.
Plug
Belt cover
Front center cover

RL131
MAINTENANCE MANUAL
7.8 Pneumatic Unit
DA8MEC-Z0-300-A0
7.8-1
7.8. Pneumatic Unit
DA8MEC-Z0-300-A0
7.8.1 Cut Waste Bottle and Tape Waste Receptacle
Unit No. N610077282AA / N610070306AA
Inspection
Period
No.
Item Task Description
Weekly
a.
Filter
Clean the filter using air blow.
(Replace it if damaged.)
When
filled
b.
Tape waste receptacle
Dispose of tape wastes.
(Depending on the production amount, dispose of tape
wastes once a shift or once a day.)
When
filled
c.
Lead cut waste bottle
Dispose of tape wastes.
(Depending on the production amount, dispose of tape
wastes once a shift or once a day.)
b. Tape waste receptacle a. Filter
c. Lead cut waste
bottle

RL131
MAINTENANCE MANUAL
7.8 Pneumatic Unit
DA8MEC-Z0-300-A0
7.8-2
7.8.2 Main Regulator
Unit No. N610060943AA
Inspection
Period
No.
Item Task Description
a.
Main pressure Make sure that air pressure is at 0.5 MPa.
Daily
b.
Pneumatic circuit
Make sure that there is no air leakage.
Hand valve
Air input
To machine
Air supply unit
b. Main pressure