NitrogenFastPurge-Upgrade - 第2页
• Increased uptime • Faster to run ready mode • Quicker transition between recipes Nitrogen Fast Purge Upgrade The Nitrogen Fast Purge option allows users to return to production ready atmosphere purity faster by allowin…

Nitrogen Fast Purge
Upgrade
Allows faster start-up and
recipe change over times through
increased gas flow rates.
Headquarters
United States
BTU International, Inc
23 Esquire Road
North Billerica, MA 01862, USA
T 1-978-667-4111 F 1-978-667-9068
E btuhq@btu.com
Europe
BTU Europe Ltd., UK
T +44 (0) 1252 660010 F +44 (0) 1252 660011
E sales@btu.co.uk
Asia Pacific
BTU Shanghai, China
T +86-21-58669098 F +86-21-58669231
E btuasia@btu.com
For more information or for a quote
please contact BTU’s parts department at
partsales@btu.com
BTU furnaces and ovens are known worldwide for
their long-term reliability and durability. We want cus-
tomers to get the most out of their systems both old
and new. We have made a number of key upgrades
available to our customers allowing them to bring their
equipment up to today’s standards. A number of the
upgrades have a focus on reducing cost of ownership by
reducing downtime, both planned and unplanned. The
kits that we’ve chosen will provide a quick payback for
most customers, in many cases less than 1 year. BTU
aims to make upgrading as easy as possible by stream-
lining the purchasing process and by including process
requalification wherever needed.
• Intellimax Upgrade
• Flux Trap Lip Vents
• Nitrogen Fast Purge
• Flux Filter
• Blower Fail Detection
• Uniformity Kit
• Closed Loop Convection
To learn visit
http://www.btu.com/support-upgrades.htm
Upgrade
PROGRAM
Enhancing Productivity and Reliability
NitrogenFastPurge-Upgrade-06.indd 1 2/6/13 1:17 AM

• Increased uptime
• Faster to run ready mode
• Quicker transition between recipes
Nitrogen Fast Purge Upgrade
The Nitrogen Fast Purge option allows users
to return to production ready atmosphere
purity faster by allowing maximum flow
of source Nitrogen. This is helpful in
production environments where the oven
is not running 24/7 or if it is critical for
the oven to return to production quickly
after routine maintenance. This upgrade
reduces purge time by up to 50%.
Project Scope
Description
Includes all necessary hardware
and electronics as well as
software conguration changes.
Procedure
BTU service will install the
upgrade kit including mechanical
and electrical components.
The technician will make the
necessary changes to the
control system and check new
components for leaks.
Installation
Upgrade to be performed by
BTU Field Service.
Downtime
4 - 6 hours.
Requalificaiton
BTU service technician will
verify Oxygen levels before
and after upgrade.
No Fast PurgeFast Purge
Purge Time (mins)*
0
10
20
30
40
50
* Based on typical applications
For more information on
Nitrogen Fast Purge Upgrade go to:
http://www.btu.com/support-upgrades-fastpurge.htm
NitrogenFastPurge-Upgrade-06.indd 2 2/6/13 1:17 AM