2500_Users_Manual - 第431页

Index ProM aster 25 00 User Manua l Inde x-7 Repairing torn ribbo n (thermal prin ter), 2-16, 5-6 0 Repl acing anti-backl ash nut, 7- 24 beam gasket , 7-25 beam head rotation motor, 7 -14 chuck tip, 4-17 control ler boar…

100%1 / 448
Index
Index-6 ProMaster 2500 User Manual
P
Package type, selecting, 3-9
Parameter entry fields, 1-14
Parameters
factory default, B-2
system and factory, B-3
Part number, labels, 4-18
Parts per tube, B-4
Parts, 2500, 2-2
PC
connecting to 2500, 2-16
requirements, 1-12
PCU (Pin Control Unit) defined, 5-19
PE (Programming Electronics)
self-calibration, 5-20
self-test, 5-50
Periodic cleaning, 5-56
Personal computer
See PC
Pico fuses, 5-13
Pin Control Unit (PCU) defined, 5-19
Pin driver board, 5-20
PLCC
devices, alignment, 4-27
module contacts, replacing, 7-30
module programming block, replacing, 7-36
PLD, test vector options, 3-13
Positioning optics, 5-7
Power supplies, theory of operation, 5-13
Power supply board, 5-19
Power up the 2500, 2-18, 4-5
Powerup self-test, Programming Electronics, 5-50
Press bearings, adjusting, 5-26
Preventive maintenance, service procedures, 5-60
Print density
about, 3-11
specifications, 1-16
Print drive motor replacement, 7-11
Print head gap, adjusting, dot matrix, 5-24
Print head replacement
dot matrix printer, 7-12
thermal printer, 7-13
Print intensity, adjusting, thermal printer, 2-29
Print Only, F-6
Print quality, dot matrix printer, 2-22
Print shift, B-4
Print shift command, thermal printer, 2-28
Print test, dot matrix printer, 5-46
Printer fuses, 5-13
Printer ribbon cassette, installing (dot matrix), 2-12
Printing problems, 5-22
Process, selecting, 3-8
Program fail message, 5-5
Program operation in a Task, 3-8
Program station, 1-9
Programmer disk, enable option in TaskLink, 3-31
Programmer port, changing the baud rate, F-9
Programming
serial numbers, 3-21
theory of operation, 5-4, 5-20
Programming block, A-6
Programming Electronics
power supply replacement, 7-19
self-calibration, 5-20
self-test, 5-50
Programming Electronics assembly
installing, 7-7
replacement, 7-3
Programming module
about, 5-20
clamp air cylinder, replacing, 7-17
configuration box, 4-9
configuration chart, 4-10
configuring, 4-8
installing, 4-12
PLCC, aligning a device, 4-27
programming block, defined, A-6
time-out delay, B-2
ProMaster parameters, 3-9
ProMaster retries, 3-28
ProMaster 2500, turning on, 2-18
Purge, F-6
Purge option, 3-31
Push buttons, 1-14
Q
Quitting TaskLink, 2-18
R
Radio buttons, 1-14
RAM fill command, 3-18
Registration, xxii
Relative addressing, 3-17
Relay board, 5-19
Remote error codes, handler, E-2, E-10
Remote mode
changing to, 2-20
command set, E-3, E-4—E-9
firmware key, B-2
how to select, 2-20
Remote port, changing the baud rate, F-9
Repair information, xvii
Repair Service, xxii
Index
ProMaster 2500 User Manual Index-7
Repairing torn ribbon (thermal printer), 2-16, 5-60
Replacing
anti-backlash nut, 7-24
beam gasket, 7-25
beam head rotation motor, 7-14
chuck tip, 4-17
controller board, 7-20
controller power supply, 7-19
DIP module contacts, 7-28
disk drive, 7-27
dot matrix printer ribbon cassette, 5-57
flex coupler, 7-21
input orbital motor, 7-7
input orbital tube clamp, 7-15
keyboard/display assembly, 7-28
labeler power supply, 7-20
lead screw, 7-23
left lead screw bearing assembly, 7-23
main fuse, 7-2
output orbital motor, 7-10
output orbital tube clamp, 7-16
pin insulation block, 7-34
PLCC module contacts, 7-30
PLCC module programming block, 7-36
print drive motor, 7-11
print head, dot matrix, 7-12
Programming Electronics assembly, 7-3
Programming Electronics power supply, 7-19
programming module clamp air cylinder, 7-17
right lead screw bearing assembly, 7-22
SOIC programming module pins, 7-33
solenoid, 7-18
system fan, 7-20
thermal print head, 7-13
thermal printer ribbon, 5-59
toroid PCB, 7-19
toroid transformer, 7-19
Requirements, input air, 2-2
Reset key, 1-10
Restore defaults, programming parameters, 3-26
Retries, programming, 3-28
RFI/EMI compliance, 1-18
Ribbon
installing, thermal printer, 2-15
repairing torn, thermal printer, 2-16, 5-60
replacing, thermal printer, 5-59
Ribbon cassette
installing, dot matrix printer, 2-12
replacing, 5-57
Ribbon not detected message, 6-4
Right lead screw bearing assembly, replacing, 7-22
RS-232C tests, 5-49
S
Safety
CE conformity, 1-18
operating noise level, 4-4
Screen movement, TaskLink, 1-13
Security fuse
check, 5-5
vectors used to verify, 3-13
Security fuse violation message, 6-4
Self-calibration, PE, 5-20
Self-test, Programming Electronics, 5-50
Serial number, programming, 3-21
Serialization
about, 3-21
External Serialization Program (ESP), 3-24
Service
contracts, 1-19
phone number, 1-19
procedures, preventive maintenance, 5-60
spares kit, 1-19
training, 1-19
Setting up labeler, 2-23
Shipped components, 2-2
SmartPort, 5-19
SOIC programming module pins, replacing, 7-33
Solenoid test, 5-37
Solenoids
replacing, 7-18
theory of operation, 5-8
Source code, Label C Program, E-16
SPA block, 5-20
SPA pins, cleaning, 5-56
Spares kit, 1-19
Specifications, 1-16—1-17
Squirt pin assembly block, 5-20
Standard programming electronics CRC, E-19
Starting TaskLink, 2-18
Statistics, logging, 3-19
Stepper motor, theory of operation, 5-8
STOP commands, 2-20, B-4—B-5
Sumcheck error message, 6-4
Support
see Customer Support
Switches, theory of operation, 5-7
System
fan, replacing, 7-20
memory, 1-16
parameters, B-3
requirements, PC, 1-12
self-check, 5-56
System Setup menu, F-9
Index
Index-8 ProMaster 2500 User Manual
T
Task
adding, 3-4
defined, 3-2
Logic Task parameters, 3-4
Memory Task parameters, 3-14
naming, 3-5
saving, 3-12
selecting a data source, 3-7
selecting a device, 3-6
selecting data file, 3-7
selecting package type, 3-9
selecting the process, 3-8
translation format, 3-7
Task parameters
data sumcheck, 3-18
memory devices, 3-14
TaskLink
adding a task, 3-4
communication with 2500, 2-19
database file defined, 3-5
error messages, 6-1—6-5
exiting, 2-18
general description, 1-2, 1-12
installing, 2-17
load from master device, 4-26
modes of operation, 1-12
modes, defined, 2-18
naming a Task, 3-5
operating modes, 2-18
saving a Task, 3-12
self-test, 5-53
setup, 2-16
starting, 2-18
theory of operation, 5-2
TaskLink screens, 1-13—1-15
Technical assistance, xix
Technical support, 1-19
Temporary file, editing, 5-43, F-3
Terminal/Host command, 3-7
Test vectors
DIP/PLCC translation, 3-14
on PLD devices, 3-13
See Also Functional test
serial vector test, 3-14
Theory of operation
calibration of labels, 5-15, 5-17
controller board, 5-13
device processing, 5-2
dot matrix printer, 5-15
label calibration, 5-7
microswitches, 5-7
optics, 5-7
programming, 5-4, 5-20
solenoids, 5-8
stepper motor, 5-8
TaskLink, 5-2, 5-4
the beam and chucks, 5-8
thermal printer, 5-17
Thermal printer
adjusting, 5-27
adjusting label print position, 5-26
adjusting print intensity, 2-29
fonts, 5-17
installing ribbon, 2-15
repairing a torn ribbon, 5-60
repairing torn ribbon, 2-16
replacing ribbon, 5-59
setting up, 2-13
theory of operation, 5-17
Time-out delay, programming module, B-2
Tools for preventive maintenance, 5-55, 5-60
Toroid PCB, replacing, 7-19
Toroid transformer, replacing, 7-19
Track
adjustment, 5-64
cleaning, 5-56
optics, 5-7
Track air, adjusting, 4-38
Track width, adjusting, 4-12
Translation format, selecting, 3-7
Traverse stepper motor, 5-8
Troubleshooting
flow charts, 6-6
optics, 5-7
overview, 6-1
Tube 1, 3-28
Typographic conventions, xxii