SM-131-006.pdf - 第180页

Device Name Chip Mounter Block Name Page No. Unit Name Revision Model Item GXH-1 Chapter 8 Component Supply 4. Replacement of Batch Connector Cable 4.1 Detachment of Batch Connector Cable (1) Pull out the feeder cart fro…

100%1 / 325
Device
Name
Chip Mounter
Block Name
Page No.
Unit Name
Revision
Model ItemGXH-1
Chapter 8 Component Supply
3. Replacement of Feeder Connector
3.2 Attachment of Feeder Connectors
(1) Follow the reverse order of detachment to attach a new connectors to the electrical box.
(a) Fix the grounding wire of each connector to the fixing area for grounding.
(Fig. H16)
(b) Check to see that no wires are trapped (pinched) and no air hoses are bent after
the connection.
(2) Place the feeder base on the feeder cart and insert the cart into the main machine.
After that, check the performance.
Check the upward and downward movement of the feeder base.
Check the clamping of the feeders.
Check that the power is supplied to the feeders.
0406-001
8-6
Device
Name
Chip Mounter
Block Name
Page No.
Unit Name
Revision
Model ItemGXH-1
Chapter 8 Component Supply
4. Replacement of Batch Connector Cable
4.1 Detachment of Batch Connector Cable
(1) Pull out the feeder cart from the main
machine.
(2) Place the feeder base on the work bench as
shown in Fig. H18.
(3) Open the electrical box of the feeder base
and place the electrical box on the work
bench as shown in Fig. H19.
(4) Disconnect the connector on the PCB side of the batch connector cable. (Fig. H19)
(5) Loosen the PCB holding bar in Fig. H19 and detach the PCB.
(6) Disconnect the connectors from each PCB in Fig. H20 and pull out the batch connector
cable.
0406-001
8-7
Fig. H18
UB16
Fig. H19
UB24
UB17
Batch Connector
Cable
PCB Holding Bar
UB16
CN27
CN29
Fig. H20
UB24
CN80
CN70
CN40
CN60
CN61
UB17
X100
X101
Device
Name
Chip Mounter
Block Name
Page No.
Unit Name
Revision
Model ItemGXH-1
Chapter 8 Component Supply
4. Replacement of Batch Connector Cable
4.2 Attachment of Batch Connector Cable
(1) Follow the reverse order of detachment to attach the batch connector cable.
Check to see that no wires are trapped (pinched) and no air hoses are bent during the
attachment.
(2) Place the feeder base on the feeder cart and insert the cart into the main machine.
After that, check the performance.
Check the upward and downward movement of the feeder base.
Check the clamping of the feeders.
Check that the power is supplied to the feeders.
0406-001
8-8