SM-131-006.pdf - 第302页
Device Name Chip Mounter Block Name Page No. Unit Name Revision Model Item GXH -1 Chapter 18 Pack aging 1. Checklist for Pack aging 1.2 Checklist for Metal Fixture Detachment Fig. R1 Locat ion of Metal Fixtures (a) Fill …

Device
Name
Chip Mounter
Block Name
Page No.
Unit Name
Revision
Model Item GXH-1
Chapter 18 Packaging
1. Checklist for Packaging
No Description Check Remarks
15
Wrap the connectors with bubble
wrap bags.
After packaging with bags, bundle and tie
them together.
16
Detachment of PCB Connector from
Touch Screen with Jig
Check for any damages after detachment.
17 Checking of Cart Stopper Rubbers Attach the stopper rubbers if disengaged.
18 Fixture of Partition Fixture with Filament Tape
19
Fixation of Feeder End Positioning
Block
Fix the tape through the lower side of the
feeder base.
20 Fixation of Bar Fixture with Filament Tape
21 Attachment of Casters
22
Check how the wing bolts of the
casters are tightened.
Put paint marks after tightening the bolts.
23 Locking of Bolts for Pedestals Lock them by screwing.
24
Fixation of LAN and Keyboard
Cables
25
Confirm that no tool is left behind
inside the machine.
26
Confirm that no unidentifiable part
is left behind after packaging.
27
Confirm that all items in the
accessory parts checklist are
checked.
(incl. the instruction manuals)
18-2
0512-001

Device
Name
Chip Mounter
Block Name
Page No.
Unit Name
Revision
Model Item GXH-1
Chapter 18 Packaging
1. Checklist for Packaging
1.2 Checklist for Metal Fixture Detachment
Fig. R1 Location of Metal Fixtures
(a) Fill in the number of detached metal fittings and bolts on the service check column
"★".
(b) While removing bolts, be careful not to drop them.
(c) After you have dropped a bolt, be sure to pick it up.
(d) Keep the checklist as a check sheet of adjustment logs for the time of delivery.
18-3
0512-001

Device
Name
Chip Mounter
Block Name
Page No.
Unit Name
Revision
Model Item GXH-1
Chapter 18 Packaging
1. Checklist for Packaging
Total Number of Required Bolts Q'ty Check ()
Truss-Head Screw M4L6
8
M5L10 with Flange
32
M4L10 with Flange
4
Name Q'ty Check ()
Beam Metal Fixture 1
2
Beam Metal Fixture 2
2
Beam Metal Fixture 3
4
Transfer Metal Fixture 1
2
Transfer Metal Fixture 2
2
Transfer Metal Fixture 3
4
Prj-No.
Customer
Start Day
Worker
Machine No.
18-4
0602-002