SM-131-006.pdf - 第316页
Chapter 19 Maintenance Checking List This chapter describes the Checking List for maintenance and inspections work. • GXH Series Maintenance Checking List 0602-001 19-A

Device
Name
Chip Mounter
Block Name
Page No.
Unit Name
Revision
Model Item GXH-1
Chapter 18 Packaging
2. Packaging Procedure
(3) Take out the machine.
• When a crane is used, make use of the four lifting lugs to lift the main body.
Be sure to use a joiner to connect a chain or a wire with the lifting lug.
The length of the chain or the wire shall be such length that will not cause the
chain or the wire at full tension to touch the machine
Fig. R16
• When a forklift is used, insert the forks (platform) from the front side of the machine
so that they will not touch the adjust bolts located at the lower area of the machine
and lift the machine.
(4) While the machine is being lifted up,
attach a special caster (4 pcs. in total)
to the lower area of each lifting lug.
Fig. R17
Lifting Lugs
Joiners
Connection of Chain or Wire with Lifting Lug
18-16
0512-001

Chapter 19
Maintenance Checking List
This chapter describes the Checking List for maintenance
and inspections work.
• GXH Series Maintenance Checking List
0602-001 19-A

0602-001 19-B