EPL6127110_YS12PF_Ope_E - 第30页

Chapter 2 Basic operation     1 1.1 Canceling emergency stop 2- 1 1.2 Clearing an error 2- 2 1.3 Typical err ors and troubleshooting 2- 3     8  …

100%1 / 148
General Contents
About this manual
1. Using this manual i
1.1 Available manuals i
  i
2. Contents of each chapter iii
3. Page layout iv
Chapter 1 Part names and functions
  1
  3
2.1 Keyboard and mouse 1-3
  4
3. Head assembly 1-5
3.1 Component pick-and-place head 1-6
3.1.1 5-in-line multi-head assembly 1-6
3.1.2 Scan camera (YS12P) 1-7
3.1.3 Multi-vision camera 1-7
3.2 Nozzle types 1-8
3.2.1 Nozzles for the 5-in-line head assemblies 1-8
3.3  0
4. Component supply section 1-12
4.1 Supplying components from feeder plates 1-12
4.1.1 YS12P 1-12
4.1.2 YS12F 1-13
4.1.2 Feeder exchange carriage 1-14
4.2 Supplying components from  5
4.2.1 ATS15 main unit 1-15
4.2.2 Pallet 1-16
5.
Conveyor unit and component recognition system
1-18
6. Axis configuration 1-19
  0
7.1 Performing a nozzle shaft blow 1-21
  6
8.1 Tape cutting during component mounting 1-26
8.2 Tape cutting during board conveying 1-27
  7
EPL6127110
Chapter 2 Basic operation
  1
1.1 Canceling emergency stop 2-1
1.2 Clearing an error 2-2
1.3 Typical errors and troubleshooting 2-3
  8
  8
2.2 Setup screen 2-11
2.3 Unit screen 2-12
3. Starting and stopping the machine 2-17
3.1 Pre-operation check 2-18
3.2 Starting the machine 2-19
3.3 Warming up the machine 2-21
  3
3.4.1 Conveyor unit setup flow 2-24
4. Preparing the component supply unit 2-26
4.1 Tape feeder 2-26
4.1.1 Setting the tape 2-26
4.1.2 Setting a tape feed pitch 2-31
4.1.3 Installation on a mounter 2-35
4.2 Wide multi-stick feeder 2-36
4.2.1 Installation of tracks and sticks 2-36
4.2.2 Installation on a mounter 2-39
4.3 Setting the tray components 2-40
4.3.1 Setting the component trays in the pallet 2-40
4.3.2 Setting a pallet in the ATS15 2-41
5. Settings on the mounter side 2-42
5.1 Setting the "Package" parameter. 2-42
  7
Chapter 3 Starting and ending production
1. Starting production 3-1
1.1 Resuming operation from the stopped point 3-6
1.1.1 Loading the saved data 3-7
1.1.2 Editing mount flags 3-7
1.2 Using the "block skip function" 3-8
1.2.1 Selecting the blocks 3-9
1.2.2 Starting operation 3-10
2. Ending production and turning power off 3-11
  3
3.1 Production 3-13
  5
  7
  9
3.5 Alignment 3-21
3.6 Retry 3-22
  3
  4
  5
3.10 Pick Rate Warning 3-27
Appendix
A1. Specifications A-1