Utah-94-721002-System-Manual.pdf - 第178页

mä~ëã~ä~Ä=~åÇ=fçåÑ~Ä lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó== System Manual WARNING BEFORE PROCEEDING WITH ANY MAINTENANCE WORK, READ SECTION 1 - HEALTH AND SAFETY . NOTES: Uninstallation and Disposal Issue 1: February 00 …

100%1 / 362
System Manual lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó== mä~ëã~ä~Ä=~åÇ=fçåÑ~Ä
WARNING
BEFORE PROCEEDING WITH ANY MAINTENANCE WORK, READ SECTION 1 - HEALTH AND SAFETY.
4) Prepare the system frames for transport by disconnecting processing modules from
the transfer chamber (if applicable) and fitting the castor assemblies.
UKP= aáëéçë~ä=
This sub-section gives guidance for disposing of the system at the end of its life. The disposal
must be carried out in accordance with local safety regulations.
To dispose the system, use the following procedure:
1) Carry out the uninstallation procedure given in sub-section 8.2, page 8-2
2) Locate, remove and dispose of any hazardous materials in accordance with local
safety regulations, e.g. batteries, o-rings, oil etc. Refer to manufacturer’s manuals.
3) Dispose of the remainder of the system in accordance with local safety regulations.
Uninstallation and Disposal
Printed: 25-May-05, 10:18 Page 8-5 of 6 Issue 1: February 00
mä~ëã~ä~Ä=~åÇ=fçåÑ~Ä lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó== System Manual
WARNING
BEFORE PROCEEDING WITH ANY MAINTENANCE WORK, READ SECTION 1 - HEALTH AND SAFETY.
NOTES:
Uninstallation and Disposal
Issue 1: February 00 Page 8-6 of 6 Printed: 25-May-05, 10:18
System Manual lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó== mä~ëã~ä~Ä=~åÇ=fçåÑ~Ä
^ééÉåÇáñ=^= jÉ~ëìêÉãÉåí=çÑ=ê~Çáç=ÑêÉèìÉåÅó=~åÇ=
ãáÅêçï~îÉ=Éãáëëáçåë=
1.
Scope of testing ...................................................................................................................... 2
2. Method of testing................................................................................................................... 2
3. Acceptable exposure standards............................................................................................. 3
4. System design ......................................................................................................................... 3
Measurement of RF & Microwave Emissions
Printed: 21-Dec-04, 13:43 Page 1 of 4 Issue 2: December 01