Utah-94-721002-System-Manual.pdf - 第199页
Installation Data = lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó mä~ëã~ä~Ä póëíÉãNMM Contents Page Change record sheet.......................................................................................................... 2 1…

mä~ëã~ä~ÄpóëíÉãNMM= lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó Installation Data
Change record sheet
Issue No. Details of change Date
4 Change Record sheet added. Service space note added to
Fig 1, Fig 2 & Fig 3.
1 November 04
5 Sub-section 5.2 – cooling water connector sizes changed.
Fig 4 updated.
1 June 05
Installation Data (ICP 180)
Issue 5: June 05 Page 2 of 18 Printed: 22-Mar-06, 6:57

Installation Data= lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó mä~ëã~ä~ÄpóëíÉãNMM
Contents
Page
Change record sheet.......................................................................................................... 2
1. Introduction ................................................................................................................ 4
2. Installation information.............................................................................................5
2.1 Dimensions..........................................................................................................................5
2.2 Weights...............................................................................................................................5
2.3 Heat load ............................................................................................................................5
3. Services connections .................................................................................................. 9
4. Gas handling ............................................................................................................. 11
5. Services...................................................................................................................... 14
5.1 Electrical Supply requirement .........................................................................................14
5.2 Water Cooling requirement............................................................................................14
5.3 Lower Electrode Cooling requirement ...........................................................................14
5.4 Compressed Air requirement ..........................................................................................14
5.5 Nitrogen requirement......................................................................................................15
5.6 Process gas requirement..................................................................................................15
5.7 Helium requirement.........................................................................................................15
5.8 Extraction requirement....................................................................................................15
6. Pump set information .............................................................................................. 16
6.1 Rotary pump purging.......................................................................................................16
7. Heater/chiller information ....................................................................................... 16
8. Interlocks................................................................................................................... 17
9. OIPT locations worldwide ........................................................................................ 18
Fig 1: ICP 180 system layout (3-frame)........................................................................................6
Fig 2: ICP 180 system layout (3-frame cluster upgradeable)......................................................7
Fig 3: ICP 180 Layout (2-frame cluster upgradeable).................................................................8
Fig 4: ICP 180 services panel.........................................................................................................9
Fig 5: Electrical connections.......................................................................................................10
Fig 6: 6-line gas pod ...................................................................................................................11
Fig 7: 6-line gas pod mounted on optional free-standing frame ...........................................12
Fig 8: 12-line gas pod .................................................................................................................13
Installation Data (ICP 180)
Printed: 22-Mar-06, 6:57 Page 3 of 18 Issue 5: June 05

mä~ëã~ä~ÄpóëíÉãNMM= lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó Installation Data
NK= fåíêçÇìÅíáçå=
This installation specification document gives information about the mä~ëã~ä~ÄpóëíÉãNMM
to
enable customers to prepare the required environment for the system.
Note that all dimensions shown in these data sheets are typical; precise dimensions depend
on the actual equipment fit. All dimensions are given in millimetres unless otherwise stated.
NOTE:
All information, services, dimensions etc., refer only to the
mä~ëã~ä~ÄpóëíÉãNMM, i.e. plasma processing at up to 200 mm wafers in
MESC compatible chambers.
Oxford Instruments Plasma Technology conducts a programme of continual product
development, and reserves the right to change the design and/or specification of equipment
without notice. The details contained in this document were correct at the time of printing
but should be confirmed immediately prior to delivery. Details of the clean room interface
will be advised at the time of delivery.
Installation Data (ICP 180)
Issue 5: June 05 Page 4 of 18 Printed: 22-Mar-06, 6:57