Fini sh p r oduction and chang e w o rk Chap ter 5 Advanced Chip Shooter DE CAN S2 O pe rat ion H an db ook 5-9 This chapter describes the method to finish production and change t he work to new work as well as the metho…

100%1 / 92
Finish production and change work
Chapter 5
Advanced Chip Shooter
DECAN S2 Operation Handbook
5-8
This chapter describes the method to finish production and change the
work to new work as well as the method to turn off the power supply
to the machine after finishing production and keeping the area around
the machine clean and tidy.
Changing Jobs > Install feeder/nozzle and order parts
Changing Jobs
Finish production and change work
7. Install feeder/nozzle and order parts
Step 1.
Secure the feeder in the corresponding slot
Step 2.
Secure the grip
Install the feeder in the corresponding slot referring to the feeder arrangement
on the PCB and arrange the nozzles in the ANC holes manually referring to the
nozzle arrangement on the ANC. Then check the parts expected to be exhausted
in advance and order them.
For further details, refer to "3. Install feeder/nozzle and order parts"
(page 3-9)
8. Backup-pin rearrangement
For more details regarding the backup pin arrangement, refer to
"Arranging Backup Pins" (page 6-11).
Caution
Arrange the backup pins after moving the backup table up.
If the double-faced board is on work, placing the backup pins
wrongly could lead to improper placement or damage the placed
components. Be sure to adjust the backup pins position correctly.
Finish production and change work
Chapter 5
Advanced Chip Shooter
DECAN S2 Operation Handbook
5-9
This chapter describes the method to finish production and change the
work to new work as well as the method to turn off the power supply
to the machine after finishing production and keeping the area around
the machine clean and tidy.
Changing Jobs > Check and teach positions
Changing Jobs
9. Check and teach positions
For further details, refer to "4. Check and teach positions" (page
3-18)
10. Placement
Download the PCB and execute the new job.
Advanced Chip Shooter
MEMO
Finish production and change work
DECAN S2 Operation Handbook
5-10