SIPLACE S-23 HM - 第346页
7 What should you do ... User Manual SIPLACE S -23 HM 7.13 Line engineer profile Software Version SR.406.xx 02/00 US Edition 346
User Manual SIPLACE S-23 HM 7 What should you do ...
Software Version SR.406.xx 02/00 US Edition 7.13 Line engineer profile
345
7.13 Line engineer profile
The line engineers should normally have attended the SIPLACE basic training course and are to
be assigned the following tasks:
– Acting as a contact for the operators
– Maintaining the machine log book
– Monitoring and carrying out maintenance at the specified intervals
– Monitoring the workplace to ensure that it is clean and safe
– Monitoring conformity with EGB regulations
– Carrying out quality control
– Following up and reporting fault messages
– Making sure that errors have been eliminated
– Providing all materials required to produce the job in a timely manner, such as
–PCBs
– Soldering paste
– Components
– Feeder modules, etc.
– Setting up the station for a new production batch
– Checking the settings of the feeder modules
– Checking the management data
– Asking the responsible programmers to modify placement programs
– Ensuring a smooth flow of information between the individual groups
7
7 What should you do ... User Manual SIPLACE S-23 HM
7.13 Line engineer profile Software Version SR.406.xx 02/00 US Edition
346
User Manual SIPLACE S-23 HM 8 Error Information
Software Version SR.406.xx 02/00 US Edition 8.1 General
347
8 Error Information
8.1 General
If errors occur during operations at the placement station, you can all up information concerning
the possible causes and ways of eliminating the error in question. To do this, you start the help
system for the station computer (see Chapter 9).
– You call error information on the currently displayed error by clicking the "Error information"
button in the main view (see section 8.2.1).
– You can call up information on an observed error of a specific type by clicking the "Error infor-
mation" button in the corresponding error display (see section 8.2.2).