TR7600 SIII_Series_Maintenance_en_v_2_0_3 - 第26页

Test Research, Inc. 16 TR7600 SI II Series User Guide – Maintenance Figure 25: Set scan information III. In the pop-up window, i nput Voltage=90Kv and current=200μA and then click [Ok] to finish. Figure 26: Set scan info…

100%1 / 74
Test Research, Inc.
TR7600 SIII Series User Guide – Maintenance 15
X-ray Source Manual Warm-Up
1) Please follow the following steps to do manual warm-up:
I. Double-click the mouse on the main program icon on the desktop.
II. Click [Utility]-->[Tool]-->[X-Ray].
III. Click ["Start Warm Up Procedure"] and it will take about 20 minutes to finish the
warm-up procedure.
Figure 24: Manual warm up
2) Based on the overload frequency, different machines have different manual warm-up
requirements to maintain the X-ray tube.
a) For new machines, please follow the suggestions below to maintain X-ray tube.
Please do warm-up maintenance manually twice per week after machines are
delivered to your assembly lines.
Please do warm-up maintenance manually once every day after machines have
been delivered to your assembly lines for more than six months.
b) For machines with occasional overload, please not only report the overload voltage
to TRI, but also follow the suggestions below to maintain X-ray tube.
To report the overload voltage to TRI:
I. Double-click the mouse on the main program icon on the desktop.
II. Click [Program] -->[Set Scan Information].
Test Research, Inc.
16 TR7600 SIII Series User Guide – Maintenance
Figure 25: Set scan information
III. In the pop-up window, input Voltage=90Kv and current=200μA and then
click [Ok] to finish.
Figure 26: Set scan info Dialog
IV. Click [On] on the main screen to activate the X-ray tube manually. After
voltage and current have reached the set values, observe the screen to
see if overload happens for 2 seconds.
Figure 27: Warm up button
Test Research, Inc.
TR7600 SIII Series User Guide – Maintenance 17
V. If overload happens, Left-click the mouse on the confined area in the
figure below. Click [Ctrl] and [R] keys simultaneously to dismiss overload
immediately and then report the overload voltage to TRI.
Figure 28: Warm up button
VI. If overload does not happen, click [Off] to turn off X-ray tube. Repeat
steps I~IV to test different voltages and currents listed below in sequence
and then report the overload voltage to TRI.
Test condition 1 (Voltage, Current) = (90kV, 300μA)
Test condition 2 (Voltage, Current) = (100kV, 300μA)
Test condition 3 (Voltage, Current) = (110kV, 300μA)
Test condition 4 (Voltage, Current) = (120kV, 300μA)
Test condition 5 (Voltage, Current) = (130kV, 300μA)
To perform warm-up maintenance manually:
I. Perform warm-up maintenance manually once every day. Please check
whether overload frequency decreases based on the time interval of every
three days.
II. About one week later, if you find overload frequency decreases until
overload does not happen anymore, you can perform the warm-up
maintenance manually once every day.
III. About one week later, if you find overload frequency does not decrease,
please do manual warm-up three times every day until overload does not
happen anymore, and then do manual warm-up once every day.
IV. If you have not used X-ray tube for several days, please repeat above
steps I~III.