Test Research, Inc. TR7600 SII I Series User G uide – Maintenance 19 II. Open Xray RampUp.ini file i n the main program folder. III. Change the setup as FFC_RampUp = 1 and Scan_RampUp = 1, and then save the upda ted file…

Test Research, Inc.
18 TR7600 SIII Series User Guide – Maintenance
c) For machines with frequent overload, please follow the instructions mentioned above
to test different voltages and currents and then report the overload voltage to TRI.
Besides, please follow the suggestions below to do warm-up maintenance.
I. Please warm up machines three times every day. You can warm up
machines during lunch break or work shift time.
II. About one week later, if you find overload frequency decreases until
overload does not happen anymore, you can do warm-up maintenance
manually once every day.
III. After a period of time, if overload often happens again, please test
different voltages and currents listed below in sequence and report
overload voltage to TRI.
Test condition 1 (Voltage, Current) = (90kV, 300μA)
Test condition 2 (Voltage, Current) = (100kV, 300μA)
Test condition 3 (Voltage, Current) = (110kV, 300μA)
IV. Start to do warm-up maintenance manually more than three times every
day.
V. If overload frequency does not decrease obviously, please increase the
manual warm-up frequency every day.
VI. If overload frequency has decreased obviously for more than three days,
please do warm-up maintenance manually once every day.
VII. If you have not used X-ray tube for several days, please repeat the above
steps I~II.
Immediate Solution For X-ray Source Overload
1) In busy assembly lines, if machines have overload and you need to do inspection
urgently, you can execute the following steps, instead of manual warm-up.
I. Left-click the mouse on the confined area in the figure below. Click [Ctrl] and
[R] keys simultaneously to dismiss overload immediately.
Figure 29: Click to dismiss Overload

Test Research, Inc.
TR7600 SIII Series User Guide – Maintenance 19
II. Open XrayRampUp.ini file in the main program folder.
III. Change the setup as FFC_RampUp = 1 and Scan_RampUp = 1, and then
save the updated file.
IV. After you update the XrayRampUp.ini file, the main program will increase the
voltage slowly whenever you scan a board or do FFC calibration.
V. After the inspection is done, you can do manual warm-up.
Figure 30: XrayRampUp.ini
Warning: If customers failed to do weekly manual warm-up, X-ray
tube warranty would be void.

Test Research, Inc.
20 TR7600 SIII Series User Guide – Maintenance
4 D
AILY
M
AINTENANCE
The purpose of daily maintenance is to ensure the safety of all people on the shop floor and
to ensure the smooth operation of TRI machine.
Warning: Except for the parts specifically mentioned, the power
MUST be turned off during maintenance. Failure to do so may cause
mechanical or electrical damage.
4.1 Check Main Power and All Cables Connection
Check the cables are properly connected.
1) Cables on main computer.
2) Cables of sensors and motors in machine.
3) System wiring at rear of the machine.
Figure 31: Main Power Cable Checking