00196591-04 UM S-Feeder Test Station EN - 第33页
Service Work Conveyor 6.1.2 Removal/installation of Lightning Board Replace the ring l ight illumination board User Manual SIPLACE S-Feeder Test Sta tion 33 Installation Proceed with the installation in the reve rse orde…

Service Work Conveyor
Replace the ring light illumination board 6.1.2 Removal/installation of Lightning Board
32 User Manual SIPLACE S-Feeder Test Station
6.1.2
6.1.2 Removal/installation of Lightning Board
Removal/installation of Lightning Board
Removal
1. Open the two screws (1)
2. Lift up the cover (2).
3. Hold the camera body firmly and open the 4 fix-
ing screws (3).
4. Slide the housing (4) upwards.
5. Put it on the cable (5) of the lighting board.

Service Work Conveyor
6.1.2 Removal/installation of Lightning Board Replace the ring light illumination board
User Manual SIPLACE S-Feeder Test Station 33
Installation
Proceed with the installation in the reverse order of removal.
6. Open the 4 screws (6) of the focusing screen and
remove them.Loosen and remove the 6 fastening
screws from the guide rail.
7. Open the 4 bolts (7) of the lighting board and re-
move it.
The disassembly is completed
NOTICE
Observe correct installation.
Pay attention for installing the correct orientation of the modules, otherwise the correct mount-
ing is not possible.
1. Please do not forget the plastic washer (1) to the
stud
Note that there is a socket for the connection cable,
on the right side

Service Work Conveyor
Replace the ring light illumination board 6.1.3 Lighting adjustment
34 User Manual SIPLACE S-Feeder Test Station
Assemble the camera body and carry out the calibration.
6.1.3
6.1.3 Lighting adjustment
Lighting adjustment
Preparatory Steps
➢ The test station should be complete for calibration, with ground glass screen and camera body
mounted.
► Connect it to the power supply and connect it the USB - camera cable to the PC.
► Switch the machine on.
2. Observe the correct installation position of the
bushing (2) in the focusing screen!
Lousy must be located under the potentiometer of
the lighting board.
Tighten the mounting screws carefully!
Imagine the calibration part (1) onto the conveyor
pitch of the test station.
2. Put it the normal white 70x70 (2), as shown in the
picture on the calibration part ..
Avoid necessarily mean that the white standard is
dirty or damaged.
Avoid direct exposure to extraneous light - sources
such as ceiling or table lighting.
3. Start the test software and go to the menu "Ex-
tras" on "Live camera position.
The camera now turns on the lights
Leave the lights turned on for about 3 minutes be-
fore making the adjustment.