00197790-01 - 第11页
Installation Guide Ausgabe 08/2014 Edition 11 2.2 Central machine cov er Loosen the 4 scre ws on both sides of the centr al machine cover and rem ove the old cover. Put the new mac hine cover with the LED -carriers i…

Installation Guide Ausgabe 08/2014 Edition
10
Mount the cable 03102816-01 to the cable sockets with cable ties
connect the cable 03102817-01 to the LED-carrier
(ATTENTION: Please consider the correct polarity)

Installation Guide Ausgabe 08/2014 Edition
11
2.2 Central machine cover
Loosen the 4 screws on both sides of the central machine cover and remove the old cover.
Put the new machine cover with the LED-carriers into the machine and mount the 4 screws.
NOTICE
Please check the correct orientation of the central machine cover according to the
drawing below.

Installation Guide Ausgabe 08/2014 Edition
12
2.3 Connection LED-carriers to power supply
Route the cable 03102817-01 through the machine to the power supply at location 1 using
cable ties and mounting bases