00197454-01_AI_Portal_40mm_TwinVHF_SX12_de_en - 第130页

assembly Final Wo rk 3.7.8 Modifications in SIPLACE Pro 130 Reconfiguration Kit Twin VHF with Gantry Reconfiguration Ki t T w i n V H F m i t P o r - Configuration of head, came ras, nozzles and tables Recipes / Jobs If …

100%1 / 140
assembly
3.7.8 Modifications in SIPLACE Pro Final Work
Reconfiguration Kit Twin VHF with Gantry Reconfiguration Kit Twin VHF mit Portal 129
Setups
The new gantry configuration of the station configuration is used automatically when new setups are cre
-
ated
If the existing Setups should be used in the future then each setup must be changed to match the gantry
configuration.
Modification of gantry configuration in the respective setup.
Location 2 can be configured afterwards.
The respective head, cameras, nozzles and tables at location 2 has to be edited.
assembly
Final Work 3.7.8 Modifications in SIPLACE Pro
130 Reconfiguration Kit Twin VHF with Gantry Reconfiguration Kit Twin VHF mit Por
-
Configuration of head, cameras, nozzles and tables
Recipes / Jobs
If existing recipes and jobs should be used in the future then all of them have to be re-optimized with the
new gantry configuration.
assembly
3.7.8 Modifications in SIPLACE Pro Checklist
Reconfiguration Kit Twin VHF with Gantry Reconfiguration Kit Twin VHF mit Portal 131
3.8
3.8 Checklist
Checklist
Put this check list in the machine logbook.
Gantry fitted (upgrade)
Step Action Who?
1 Gantry fitted? Customer in line with assembly
guide
2 Are the modules fitted in the correct positions? Customer in line with assembly
guide
3 Are the correct end position buffers fitted? Customer in line with assembly
guide
4 Has the trailing cable been fitted correctly? Customer in line with assembly
guide
5 Does the trailing cable run parallel? Customer in line with assembly
guide
6 Is the gantry coding correct? Customer in line with assembly
guide
7 Is the stationary camera (optional) fitted? Customer in line with assembly
guide
8 Are the camera connections connected to the box PC? Customer in line with assembly
guide
9 Has the nozzle changer been fitted? Customer in line with assembly
guide
10 Is the reject bin fitted? Customer in line with assembly
guide
11 Have all tools been removed from the machine? Customer in line with assembly
guide
12 Are the doors screwed? Customer in line with assembly
guide
13 Is the machine switched on and ready for operation? Customer in line with assembly
guide
14 Have all calibration steps been performed? Customer in line with assembly
guide
Date Signature