00197795-04_JC_PM_WF1_SX12_EN - 第15页

1 WF1 SX1/2 Remove tables (COT), exchange nozzles and shut down machine (if re- quired). 2.5 min 1 / 3 C A U T I O N !  R e f e r t o s a f e t y i n s t r u c t i o n s i n u s e r m a n u a l b e f o r e c o m m e n c…

100%1 / 82
www.asm-smt.com
Head Exchange Kit - Overview
1 WF1 SX1/2 Remove tables (COT), exchange nozzles and shut down machine (if re-
quired).
2.5 min 1 / 3
CAUTION! Refer to safety instructions in user manual before commencing Maintenance
Machine Status ON Transport Empty
NOTICE! ESD guidelines are to be followed Tool: Wear Part:
W1, W2, W3, W58, W63
Consumables:
www.asm-smt.com
1 Stop production and click on " Block con-
veyor ".
2 Block all lanes and click "OK". 3 Click on "Maintenance".
4 Select all heads. 5 If a head is to be maintained proceed with
next step otherwise proceed with step 12.
6 Click on "Nozzle reference run".
1 WF1 SX1/2 Remove tables (COT), exchange nozzles and shut down machine (if re-
quired).
2.5 min 2 / 3
CAUTION! Refer to safety instructions in user manual before commencing Maintenance
Machine Status ON Transport Empty
NOTICE! ESD guidelines are to be followed Tool: Wear Part:
W1, W2, W3, W58, W63
Consumables:
www.asm-smt.com
7 Click on "Generate report". 8 Enter name and comment and click on
"Save".
9 Click on "Prepare for head exchange and
shutdown".
10 Click on "Shut down". 11 Proceed with step 13. 12 Click on "Prepare for manual mainten-
ance".