STM1-S_SDV_Maintenance(Eng_Ver1).pdf - 第24页
Chap ter 2 Inspe ction It ems fo r Main t e nanc e Multi -Func tional Placer ST M1-S M ain ten an ce Ha nd bo ok 2-3 W eekly Inspections Che ck-up List Rep la cement Time Referen ce Time requ ired Per iod No Inspection I…

Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
STM1-S Maintenance Handbook
2-2
Daily Inspections
Inspection Items for Maintenance

Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
STM1-S Maintenance Handbook
2-3
Weekly Inspections
Check-up List
Replacement
Time
Reference
Time
required
Period No Inspection Item Measures Tools
Weekly
W-1 Solenoid Valve Inspect and replace 2 years
Contact C/S for
replacement
20 Minutes
W-2 Head Vacuum Filter Inspect and replace 6 months
Contact C/S for
replacement
30 Minutes
W-3 Conveyor chamber Clean Cloth 15 Minutes
W-4 Detach vacuum ejector filter Replace 10 Minutes
Setting the replacement period for parts
ㆍ Based on the regulated use environment.
ㆍ If the use environment is poor, the intervals for part inspection and replacement can be shortened.
ㆍ In the above table, C/S means our designated C/S company (STS) or our overseas local agents.
Weekly Inspections

Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
STM1-S Maintenance Handbook
2-4
Weekly Inspections
Inspection Items for Maintenance