STM1-S_SDV_Maintenance(Eng_Ver1).pdf - 第27页

Chap ter 2 Inspe ction It ems fo r Main t e nanc e Multi -Func tional Placer ST M1-S M ain ten an ce Ha nd bo ok 2- 6 Monthly Inspections (1/2) Inspection It ems for Maint enanc e

100%1 / 84
Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
STM1-S Maintenance Handbook
2-5
Monthly Inspections (1/2)
Check-up List
Replacement
Time
Reference
Time
required
Period No Inspection Item Measures Tools
Monthly
M-1 Head Spindle Clean Air gun, cloth 30 Minutes
M-2 Conveyor Sensor Inspect and clean Cotton swab, cloth 10 Minutes
M-3 Cover Cooling Fan Inspect and clean
Crosshead screwdriver,
vacuum cleaner
10 Minutes
M-4 Cover Cooling Fan Filter Replace Vacuum cleaner 6months 15 Minutes
M-5 Head LM Guide, Ball Spline Clean and apply grease Brush, cloth
Apply grease period:
3 months
30 Minutes
Setting the replacement period for parts
Based on the regulated use environment.
If the use environment is poor, the intervals for part inspection and replacement can be shortened.
In the above table, C/S means our designated C/S company (STS) or our overseas local agents.
Monthly Inspections (1/2)
Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
STM1-S Maintenance Handbook
2-6
Monthly Inspections (1/2)
Inspection Items for Maintenance
Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
STM1-S Maintenance Handbook
2-7
Monthly Inspections (2/2)
Check-up List
Replacement
Time
Reference
Time
required
Period No Inspection Item Measures Tools
Monthly
M-6 X Frame LM Guide, Ball Screw
Clean and Lubrication
Lubricator, cloth AFE (THK) Lubrication period: 4 months 60 Minutes
M-7 Y Frame LM Guide
Clean and Lubrication
Lubricator, cloth AFE (THK) Lubrication period: 2 months 60 Minutes
M-8 Y Frame Ball Screw
Clean and Lubrication
Lubricator, cloth AFE (THK) Lubrication period: 2 months 20 Minutes
M-9 Ionizer Nozzle Cleaning
Air gun, cotton swab
Inspection period: 1 months 10 Minutes
M-10 Cover Cleaning
Utra-fine fiber cloth, Alcohol
(
Heavy Duty Staticide #2005,
#2001)
Inspection period: 1 months 15 Minutes
M-11 Y Cable Duct Cooling Fan Inspection and clean Vacuum cleaner
If it is found to have been damaged replace it. 15 Minutes
Yaer Y-1 Ionizer Nozzle
Inspection and
replace
Ionizer Nozzle Corresponding
fixture
If it is found to have been damaged replace it. 15 Minutes
ETC
E-1 Fuse Replace (+) driver
If it is found to have been damaged replace it. 15 Minutes
E-2 Ring blower fuse Replace (+) driver
If it is found to have been damaged replace it. 15 Minutes
E-3 Ring blower inverter Setup
15 Minutes
Setting the replacement period for parts
Based on the regulated use environment.
If the use environment is poor, the intervals for part inspection and replacement can be shortened.
In the above table, C/S means our designated C/S company (STS) or our overseas local agents.
Monthly Inspections (2/2)