Overview of the Modules Head Maintenance Kit (HMK) 2.3.2 Twin VHF 16 Maintenance Manual SIPLACE Placement Heads CPP, C&P20, Twin 2.4 2 . 4 H e a d M a in t e n a n c e K it ( H M K ) Head Maintenance Kit (HMK) See al…

100%1 / 92
Overview of the Modules
2.3.1 Twin and Twin HF Twin Variants
Maintenance Manual SIPLACE Placement Heads CPP, C&P20, Twin 15
2.3
2.3 Twin Variants
Twin Variants
2.3.1
2.3.1 Twin and Twin HF
Twin and Twin HF
2.3.2
2.3.2 Twin VHF
Twin VHF
Twin
The TwinHead consists of two Pick&Place modules.
1. Module 1
2. Module 2, rotated by 180° compared to module 1.
3. Main board on relevant module
4. D axis
5. Linear motor Z axis
6. Z axis incremental measurement system
7. Camera lens hood Twin
X-Series S, SX4/DX4, X-Series, HF: [03001846-xx]
SX1/SX2/DX1/DX2 [03079524-xx]
1. Head board
2. Air filter
3. Return unit
4. Digital valve
5. Camera screen [03002232-xx]
6. Z axis
Overview of the Modules
Head Maintenance Kit (HMK) 2.3.2 Twin VHF
16 Maintenance Manual SIPLACE Placement Heads CPP, C&P20, Twin
2.4
2.4 Head Maintenance Kit (HMK)
Head Maintenance Kit (HMK)
See also
3.2 Tools, Consumables, Spare and Wear Parts [ ➙ 18]
8.2 Tools, Consumables, Spare and Wear Parts [ ➙ 81]
3 Maintenance tasks for CPP [ ➙ 17]
3.2 Tools, Consumables, Spare and Wear Parts [ ➙ 18]
Head Maintenance Kit [03109541-xx]
The Head Maintenance Kit contains the general tools for
maintenance work on placement heads.
In addition to the Head Maintenance Kit [03109541-xx],
the following kits can be used, if required:
Head Maintenance Kit Option for C&P20 A
[03109643-xx]
Head Maintenance Kit Option for CPP [03109692-xx]
Head Maintenance Kit Option for C&P20 P
[03112643-xx]
Maintenance tasks for CPP
Maintenance Intervals
Maintenance Manual SIPLACE Placement Heads CPP, C&P20, Twin 17
3
3 Maintenance tasks for CPP
Maintenance tasks for CPP
3.1
3.1 Maintenance Intervals
Maintenance Intervals
5105 - Major - CPP
9000 – Foot not e * Maintenanc e display
* see also maintenance display
Maintenance tasks
Multistar CPP
(6-monthly or after 40 mill. components)
Duration
[min]
Each
week
Every 3
months
Every 6
months
Every 12
months
Preparing the Placement Head 2 X*
Replacing the Pressure Control Valve 3 X*
Maintenance Tasks on Vacuum-Conducting Parts
Removing the Screwed Joint of the Silencer
Check/replace the silencer
Removing the Holding Circuit
Cleaning the Housing of the Holding Circuit
Replacing the O-Rings on the Housing of the
Holding Circuit
Cleaning the Screwed Joint
Installing the Silencer and the Screwed Joint
8X*
Oiling the Z Axis Support Roller 2 X*
Oiling the Z Axis Linear Guide 1 X*
Checking/Replacing the DP Vacuum Hoses 1.5 x X*
Cleaning the Light Barrier on the DP Drive 15 X*
Oiling the DP Segment Guide 4 X*
Oiling the DP Driver Bearing 6 X*
Replacing the Filter Disks 3 X*
Oiling the Star Bearing 3 X*
Cleaning the Component Sensor 1 X*