ServiceInstruction_Vision XP - 第15页
Vision XP+ V AC P age 1 1 2 Maintenance 2.3 Mainten ance Schedule Operating Instructions V ersion 1.5 Cleaning / lubri ca- tion PCB and CBS spindles at the in- let and the o utlet as well as the oven station x 1 min. 1 h…

Page 10 Vision XP+ VAC
2 Maintenance
2.3 Maintenance Schedule
Operating Instructions
Version 1.5
2.3 Maintenance Schedule
Specified cycles and times may vary depending upon throughput and the
types of materials processed in the system. The specified times are based
upon empirical values for 3-shift operation.
Under certain circumstances, specified maintenance intervals must be
adapted to prevailing conditions by the operator (production volumes, num-
ber of shifts etc.)
2.3.1 Maintenance Schedule Nitro
Note!
To ensure that equipment is gas tight after maintenance or repair work, a
residual oxygen measurement should be made.
Warning!
The temperature should be measured occasionally. The temperature must
be checked and measured again after servicing. .
Sector Maintenance task
(inspection, cleaning
and replacement of
parts if necessary)
Daily
Weekly
Fortnightly
Monthly
Quarterly
Semiannually
Annually
Inspection Time
Maintenance Time
Replacement
Recommend-
ed Parts and
Materials
Process cham-
ber
Interior cleaning x 2 min 30 min Oven
cleaner
Vacuum
cleaner
Cleaning of guide
rails
x 1 min 5 min Oven
cleaner
Inspection of cur-
tains, replacement
if necessary
x 1 min 30 min Oven
cleaner
Chamber seal
cleaning
x 1 min 5 min 1 h appropriate
cleaning
agent

Vision XP+ VAC Page 11
2 Maintenance
2.3 Maintenance Schedule
Operating Instructions
Version 1.5
Cleaning / lubrica-
tion PCB and CBS
spindles at the in-
let and the outlet
as well as the
oven station
x 1 min. 1 h. Oven
cleaner,
Chain oil
Check spindle nut
for „clearance“
+/- ~ 5°
x 1 min.
Nozzle holder
(VXP+)
Clean blocked
holes
Oven cleaner
x 1 min. 5 min Oven
cleaner
Trapped heat
cooler (VXP+)
Remove dust from
cooler
x 1 min. 5 min Vacuum
cleaner
Vacuum cham-
ber
Checking Sensors x 1 min. Sensors
to lubricate trans-
port
x 1 min. 5 min. Lubricant
Spindles, chain,
lifting mechanism
x 1 min. 1 min. Vacuum
grease,
Vacuum
spray,Chai
n oil
Check seal x 1 min.
Vacuum pump Check the fill level x 1 min. 1 min Fomblin
Pump station,
maintenance acc.
to manufacturer
x 1 min. For further information see the
manufacturer´s description
Cooling tract /
Condensate trap
Cleaning of cooler
/agglomerator
x 2 min If neces-
sary
2 min Cooler /
agglomera-
tor
Cleaning of fan im-
pellers
x 1 min If neces-
sary 10
min
10 min Fan Impel-
ler
Replacement of
fine filter as the
need arises
x 2 min 5 min Fine filter
EC gas blower
(VXP, VXP+
VXP+ VAC)
Clean blower, re-
place if necessary
x 5 min. If neces-
sary
10
min.
Blower
Sector Maintenance task
(inspection, cleaning
and replacement of
parts if necessary)
Daily
Weekly
Fortnightly
Monthly
Quarterly
Semiannually
Annually
Inspection Time
Maintenance Time
Replacement
Recommend-
ed Parts and
Materials

Page 12 Vision XP+ VAC
2 Maintenance
2.3 Maintenance Schedule
Operating Instructions
Version 1.5
Cooling zone 1
(VXP)
Cleaning cooling
zone 1
x 1 min If neces-
sary
2 min
Inlet Inspection of inlet
filter, cleaning if
necessary
x 1 min If neces-
sary
2 min
Check Sensor and
cleaning if neces-
sary
x 1 min If neces-
sary
2 min
Inlet exhaust Inspection of con-
tainer, connecting
pieces and throttle
cleaning if neces-
sary
x 1 min If neces-
sary 5
min
Outlet Inspection of out-
let filter, cleaning if
necessary
x 1 min If neces-
sary
2 min
Outlet exhaust Inspection of con-
tainer, connecting
pieces and throttle
valve cleaning if
necessary
x 1 min If neces-
sary 5
min
Pyrolysis Replacement of
granulate, seals
x 2 h Granulate,
seals
Gas take-off
point
Cleaning of gas
take-off point
x 1 min 5 min Hex key,
Cleaning
rag
Analyzer Pre-filter ex-
change
x indi-
cated
5 min Activated
carbon filter
Activated carbon
exchange
x indi-
cated
5 min Activated
carbon
Conveyor sys-
tem
Inspection of
chain oil fill level
x 1 min 2 min Chain oil
Inspection of
chain tension
x 10
min
30 min
if neces-
sary
Chain oil
Sensors checking x 1 min 2 min
water tank Inspection of wa-
ter tank fill level if
necessary refill
x 1 min If neces-
sary 3
min
water, anti-
freeze
Sector Maintenance task
(inspection, cleaning
and replacement of
parts if necessary)
Daily
Weekly
Fortnightly
Monthly
Quarterly
Semiannually
Annually
Inspection Time
Maintenance Time
Replacement
Recommend-
ed Parts and
Materials