ServiceInstruction_Vision XP - 第56页
Page 52 Vision XP+ V AC 2 Maintenance 2.12 Pyrolysis Operating Instructions V ersion 1.5 Fig. 2-8 3 Remo ving the Ins ulation Fig. 2-8 4 Loose ning the N uts Fig. 2-8 5 Remo ving the Ins ulation Fig. 2-8 6 Lifting off th…

Vision XP+ VAC Page 51
2 Maintenance
2.12 Pyrolysis
Operating Instructions
Version 1.5
2.12 Pyrolysis
2.12.1 Replacing the Granulate
Fig. 2-81 Pyrolysis Unit
The pyrolysis unit is located at the
back of the system at the oven inlet.
Note!
The system must be cooled down before replacing the granulate, because
the granulate has a temperature of at least 500° C when the system is
running.
Fig. 2-82 Unscrewing the Door
Consumable materials, tools:
• Open-end wrench and hex key
• Granulate
• Cartridge seal
Procedure:
1. Remove the screws from the
cover and set them aside.
2. Loosen the nuts at the pyrolysis
unit and remove the cover.

Page 52 Vision XP+ VAC
2 Maintenance
2.12 Pyrolysis
Operating Instructions
Version 1.5
Fig. 2-83 Removing the Insulation
Fig. 2-84 Loosening the Nuts
Fig. 2-85 Removing the Insulation
Fig. 2-86 Lifting off the Grate
3. Remove the white insulation
which now becomes visible (see
Fig. 2-83). The cover of the py-
rolysis unit becomes visible as
well.
4. Loosen the nuts on the granu-
late container (see
Fig. 2-84) and lift it out along
with the granulate (see
Fig. 2-85). It must be assured
that the nuts and the washers
do not fall into the pipe connec-
tion.
5. Remove the screws which se-
cure the grate and lift the grate
and Gauze Filter off (see Fig. 2-
86).
6. Inspect the granulate for con-
tamination by breaking open
several pellets. If the granulate
is dark colored all the way
through, it has become saturat-
ed and must be replaced.
7. Fill the container with new gran-
ulate under dust-free condi-
tions.
8. Apply copper paste to the
threads. Copper paste is heat-
resistant up to 1000° C.
If the old nuts need are no lon-
ger usable, do not replace them
with stainless steel or zinc plat-
ed nuts.
9. Reinstall the granulate contain-
er by following the above in-
structions in reverse order,
insert the insulation and the
seals (or replace if damaged)
and secure the cover with the
screws.

Vision XP+ VAC Page 53
2 Maintenance
2.13 Gas take-off point: N2 regulation
Operating Instructions
Version 1.5
2.13 Gas take-off point: N2 regulation
Fig. 2-87 Gas take-off point
Fig. 2-88 Cleaning the gas take-off point
Fig. 2-89 Sealing the gas take-off point
The gas take-off point for N2 regula-
tion is located in the peak 2 bottom.
Consumable materials, tools:
• Wrench
• 8 mm metal rod
• Teflon tape
• Rag
Procedure:
1. Remove the fitting from the
take-off point.
2. Lay the rag over the metal rod
and use it to clean the take-off
point.
3. In order to reseal the gas take-
off point after cleaning, wrap the
thread with Teflon tape and
tighten the fitting with a wrench.