TX_V2_年保养英文 - 第4页

www.asm-smt.com Table of Contents

100%1 / 74
www.asm-smt.com
Introduction
Safety Introduction
Equipment required for Workflow 4 Maintenance TX V2
1 Test the tape cutter
2 Shut down, remove all tables (COT) and exchange all nozzles
3 Empty and clean the reject bin
4 Remove the TH to be maintained
5 Return a maintained TH
6 Clean the Z-Axis of the remaining C&P20x heads
7 Grease the guide bearing, clean the linear guide and scale of the Y-Axis
8 Grease the guide bearing, clean the linear guide and scale of the X-Axis
9 Check and clean the magnetic surfaces of X- and Y-Axis
10 Clean the conveyor, lifting tables and gantry cables
11 Clean the fiducial bars (TX V2 micron and HD only)
12 Check and clean the gas pressure shock absorber
13 Clean and lubricate the TH nozzle changer
14 Check and lubricate the docking unit
15 Clean the feeder modules and cut the tapes
16 Lubricate the X-feeder table
17 Switch on the machine and return the tables (COT)
18 Calibrate the maintained TH
19 Check the cover fans
20 Check the filter discs of all C&P20x
21 Check the nozzle status of all C&P heads
22 Endurance run
Table of Contents
www.asm-smt.com
Table of Contents
www.asm-smt.com
Introduction
To ensure that your SIPLACE machine is always in perfect condition for use in your production environment, the machine should be maintained on a regular basis. In or-
der to optimize the "Uptime" for each maintenance interval four workflows have been defined combining the individual steps to form an efficient sequences of tasks to be
performed. All workflows are explained in detail and illustrated with clear diagrams.
Maintenance workflows
Each workflow is supported with a document (job card), which guides you efficiently through the maintenance work.
– Workflow 1: Weekly maintenance tasks.
– Workflow 2: Combination of weekly and 3-monthly maintenance tasks.
– Workflow 3: Combination of weekly and 6-monthly maintenance tasks.
– Workflow 4: Combination of weekly and 12-monthly maintenance tasks.
Planning workflows
Example for the frequency of individual workflows over a period of one year.
– Workflow 1: 45 times / year
– Workflow 2: 4 times / year
– Workflow 3: 2 times / year
– Workflow 4: 1 time / year