4OM-1610-002_w - 第51页
4OM-1610 091 1-001 1-B

4OM-1610
1011-002 1-A
Chapter 1
Maintenance
In this chapter, all about maintenance are described.
1. Outline of Maintenance
2. Maintenance Check List
3. Maintenance Spots
4. Maintenance Method
5. Consumables and Servicing Parts

4OM-1610
0911-001 1-B

4OM-1610
1-1
1. Outline of Maintenance : Chap.1
1011-002
1. Outline of Maintenance
This session describes how to perform inspections, cleaning, lubrication, and
adjustment to keep the machine in good shape.
Be sure to periodically perform the maintenance tasks.
1.1 Notes on Maintenance
WARNING
Only a well-trained service person should perform
maintenance tasks carefully through the specied
procedures.
Before maintenance work, shut off the power breaker
and lock the power breaker with the padlock.
Designate a person who can have charge of the
padlock key.
If the provided padlock is lost or damaged, purchase
its substitute.
CAUTION
Even when the power breaker is set to "OFF", the
primary line is powered, making it possible to cause
an electric shock.
Be sure to completely stop the power supply to the
machine before maintenance work.
Residual voltages may remain behind for a few
minutes in the internal devices of the machine after
power interception.
Before performing maintenance work, wait until the charge
lamps of the DC power supply and the servo amplier go
"OFF" in 10 minutes or more after the power breaker is set
to "OFF".
Note
(a) Preliminary preparation is required for some maintenance tasks with the
power being supplied.
(b) Note that the linear measure sensors must be cleaned with the power being
supplied.
Although the load power to the motors, etc., is turned OFF when the
transparent cover is opened, the maintenance must be performed carefully
because you have to put your hand(s) inside the machine.