4OM-1003-007 - 第136页
1.4.9 Lubrication of Linear Guide in Feeder Carriage Section Grease should be applied every 6 months after the initial month. • • • • • Preparation for Lubrication (1) T urn off the power supply to the machine and wipe o…

Fig. 4A84-1
(5) Detach the lower blade by removing Bolts C (M5 × 12).
When the lower blade cannot be detached easily, try to pull it
right and left alternately.
(6) Attach a new lower blade and secure it with Bolts C (M5 × 12).
(7) Attach the new lower blade holding plate and secure it with Bolts B
(M5 × 12).
(8) Attach a new upper blade and secure it with Bolts A (M5 × 16).
(9) Close the central safety guard of the feeder unit.
(10) Turn on the power supply of machine and confirm that the rotary
turret works normally, using "Smooth Manual Axis Operation (Low
Speed)" for the rotary turret.
Before operation, be sure to confirm that the lower blade holding
plate is securely attached.
Refer to "2.2.1 "Rotary Turret” Tab" in "Section 6 (Vol. 2)" for de-
tails.
1.4 Maintenance Method
0511-005 1-69 AIL01ETRP
Lower Blade Bolts C
Note
Notice

1.4.9 Lubrication of Linear Guide in Feeder Carriage Section
Grease should be applied every 6 months after the initial month.
••
••
• Preparation for Lubrication
(1) Turn off the power supply to the machine and wipe off old grease
on the rail of the linear guide with a rag.
(2) Prepare the FL- and P-type or the U- and P-Type attachments.
Fig. 4A85
••
••
• Lubrication Procedure
The linear guide in the feeder carriage section must
be lubricated with the [POWER ON] button on the
operation panel being pressed ("ON" condition).
It is dangerous. Be sure to lubricate alone (without
any other attended personnel).
(1) Press the [UNIT ADJ.] button on the submenu bar of the "MAINT."
window. After that, press the "Oil Supply" tab in the "Fdr Crg" tab
sheet. The following tab sheet appears.
Fig. 4A85-1
0511-003 1-70 AIL01ETRP
1.4 Maintenance Method
FL Type
P Type
U Type
CAUTION

0305-001 1-71 AIL01ETRP
1.4 Maintenance Method
(2) When the [Start Oil Supply] button is pressed in the "Oil Supply" tab
sheet, the following sheet appears.
Fig. 4A85-2
(3) Press the [ALL] button (entitled "ZERO"). In two seconds, press the
[ENABLE] button on the operation panel. All devices are zeroed.
(4) Press the [F1] and [F2] buttons (entitled "FEEDER READY").