2OM-1075-002.pdf - 第223页
AHB01ESPP 7 . 4 "Feeder Unit Set Status" T ab The corresponding tab sheet enables the operator to confirm the re- quired feeders and check if the correct feeders are actually installed on the feeder bases. • • …

AHB01ESPP
*2 Mode
Displayed is the operating mode of each device.
*3 "Control Sw" Group Box
When the [ENABLE] button on the operation panel is pressed in 2
seconds after one of the buttons in "*1" is selected and the [ON]
button (entitled "MOVE") is pressed, the action corresponding to the
selected button takes place.
••
••
• Operation Procedure
(1) Select one of the buttons in "*1" as the device to be inspected.
(2) Press the [ON] button (entitled "MOVE"). In 2 seconds, press the
[ENABLE] button on the operation panel. The motor starts rotating.
To stop the rotation, press the [STOP] button on the operation panel.
7.3 "PCB Support Pins Set-up Mode" Tab
0206-001 5-56-2

AHB01ESPP
7.4 "Feeder Unit Set Status" Tab
The corresponding tab sheet enables the operator to confirm the re-
quired feeders and check if the correct feeders are actually installed on
the feeder bases.
••
••
• Sheet Layout
When the "Feeder Unit Set Status" tab is pressed in the "PRGM. CHG."
window (submenu), the following tab sheet appears.
Fig. 2E48 "Feeder Unit Set Status" Tab Sheet
The tab sheet may look different, depending on which options
are selected.
••
••
• Sheet Composition
*1 Crnt. Prgm.
Displayed are the types of the feeders specified in the placement
feeder location data.
*2 Status
Displayed are the types of the actually installed feeders.
7.4 "Feeder Unit Set Status" Tab
Note
0206-002 5-57
*1
*2

AHB01ESPP
8. Running-In Operation
After the machine has been stopped for a long period of time, perform a
running-in operation for approx. 30 minutes to smoothly start up the
machine.
Operation Procedure
(1) Select the required pattern program and perform the program and
product change operations.
Refer to "7. "PRGM. CHG." Window (Submenu)" in "Section 5"
for the program and product change operations.
Observe the following to prevent any deficiency
in the running-in operation.
• Do not set any P.C.B. to be produced on the ma-
chine.
• The feeders can be installed on the feeder bases.
However, it should be noted that the settings of the
test run (described hereinafter) must be correctly
made.
8. Running-In Operation
Note
0308-002 5-58
CAUTION