2OM-1075-002.pdf - 第76页

Section 3 Program Change Operation This section describes the procedure of program change operation for the model to be produced for the first time. 0308-002 3 - A AHB01ESPP

100%1 / 469
2.15 Automatic Recovery (Priority of Component)
Function
When this function is used, the machine does not stop immediately
after it has detected a component shortage, etc.
When the machine has detected a component shortage, etc., a mes-
sage is issued as machine information, prompting the operator to re-
plenish components.
The machine continues to place the components other than the miss-
ing ones (component-shortage detected ones). After it has placed all
components (excluding the missing ones), it stops running without dis-
charging the P.C.B.
When component shortage errors, etc., are detected in different feed-
ers at a short interval, the loss time can be reduced because the com-
ponents in short can be replenished collectively.
Table 2B15
Step Reference
1. Setting of Operation Mode "3.3 "Opn. Mode" Tab" in "Section 5"
2.15 Automatic Recovery (Priority of Component) Function
0206-001 2-26 AHB01ESPP
Section 3
Program Change Operation
This section describes the procedure of program change
operation for the model to be produced for the first time.
0308-002 3-A AHB01ESPP
0107-001 3-B AHB01ESPP