00191017-01 - 第325页
User’s Manual Line Computer UNIX 11 Production Tools / Optimization Software Version 403.xx Edition 06/97 11.4 Optimizati on Dialog 11 - 31 11.4.3.10 Displa ying Result File The compl ete resu lts of the set-u p optimiz …

11 Production Tools / Optimization User’s Manual Line Computer UNIX
11.4 Optimization Dialog Software Version 403.xx Edition 06/97
11 - 30
11.4.3.6 Starting the Feeder Editor
In the Feeder Editor it is possible to globally define for the line allocations of components and package forms
to given feeders and waffle-pack trays. Any faulty or missing allocations that were determined in an optimization
run can, at this point, be corrected or newly defined (see chapt. 9).
Procedure:
●
On the SERVICES menu click on the Starting Feeder Editor option.
The Feeder Editor is started.
11.4.3.7 Starting the Restriction Editor
Clicking on the option „Starting Restriction Editor“ on the FILE menu causes the "Feeder Editor: Losplanung“
to be opened. In this editor it is possible to define for the individual lot files given allocations, restrictions, bindings
and exclusions (see chapt. 9).
Procedure:
●
Click on a lot file.
●
On the SERVICES menu click on the Starting Restriction Editor option.
„Feeder Editor: Losplanung“ opens.
11.4.3.8 Checking for Producibility
Following the optimization run, a producibility check can be carried out for a lot file or for individual jobs. The
producibility check takes into account gantry dependencies and vibration times of the feeders. The results are
therefore more accurate than with optimization.
Procedure:
●
Click on a lot file or a job.
●
On the SERVICES menu click on the Perform producibility check option.
A producibility check is then performed.
11.4.3.9 Displaying the Set-Up
In the Set-Up Modification Generator all set-ups and set-up changeover instructions can be displayed and
printed out (see chapt. 14, section 14.5).
Procedure:
●
Click on a job.
●
On the SERVICES menu click on the Display set-up option.
The „Set-Up Modification Generator“ opens.

User’s Manual Line Computer UNIX 11 Production Tools / Optimization
Software Version 403.xx Edition 06/97 11.4 Optimization Dialog
11 - 31
11.4.3.10 Displaying Result File
The complete results of the set-up optimization and the producibility check are saved to different files. These
files can be viewed by means of the file display window and printed out. They contain the data in ASCII format
and are shown in tabulated form.
Result file of set-up optimization
The results of set-up optimization of all jobs are saved to the
xx.lose/.eg
file. It contains a complete listing of all
results.
Procedure:
●
Click on a lot file.
●
On the SERVICES menu click on the Display result file option.
The file display window for the results of the selected lot file is displayed.
●
To obtain a printout: On the FILE menu click on the Print option.
The file will be printed on the printer connected.
Result file of producibility check
The results of the producibility check for each job are saved to a separate result file
xx.AR/.NC
. This file contains
a complete listing of all data concerning the production of the job.
Procedure:
●
Click on a lot file.
●
Click on a job.
●
On the SERVICES menu click on the Display result file.
The file display window for the results of the selected job is displayed.
●
To obtain a printout: On the FILE menu click on the Print option.
The file will be printed on the printer connected.
11.4.4 Command Area „Actions“
In the "Actions" command area, the icons are displayed by means of which the optimization of a lot file can be
started and aborted, as well as the results of the optimization run displayed.
-
Start Optimization
Clicking on this icon causes the optimization process to be started.
●
Click on .
●
Click on the lot file you wish to be optimized.
The optimization process is started. The progress of the optimization process can be monitored in the
info box. The status of the lot file is described as „In progr.“.
After optimization has been successfully completed, the state of the lot file is identified as
„Optimized“.

11 Production Tools / Optimization User’s Manual Line Computer UNIX
11.4 Optimization Dialog Software Version 403.xx Edition 06/97
11 - 32
-
Stop Optimization
Clicking on this icon allows the current optimization process to be aborted.
●
Click on
●
Click on the lot file that is being optimized.
The optimization run in progress is aborted. The status of the lot file now changes to „Aborted“.
If optimization of this lot file was aborted, it may be restarted at any time.
-
Display Results
This icon enables the results of the set-up optimization process to be displayed graphically both for
the entire lot file or for the individual jobs of a lot file. Moreover, the results of the producibility check
can be displayed for the individual jobs.
Displaying Optimization Results
●
for the entire lot file:
●
Click on .
●
Click on the lot file containing the results are to be displayed.
The results of optimization are displayed in the „Optimization results for xx.lose“ window
(see Fig. 11.4.3).
●
To obtain a printout: On the FILE menu click on the
Print
option.
The file will be printed on the printer connected.
Fig. 11.4.3 „Optimization results for xx.lose“ window for a lot file