1OM-1625-004_w.pdf - 第137页

1OM-1603 3-14 2. Program Change Operation : Chap.3 1012-005 2.2.4 Preparation for Feeders Procedure (1) Refer to the placement feeder location data in the pattern program and conrm that the required feeders are installe…

100%1 / 219
1OM-1603
3-13
2. Program Change Operation : Chap.3
1007-004
2.2 Preparation for Program Change Operation
2.2.1 Preparation for Component Library
Library data must be created for new components when there is no component
library data required to create a pattern program.
Reference
(a) Refer to "Chapter 3 Component Library" in Volume 2 for window
navigation.
(b) Refer to "Volume 6: Component Library" for how to create the data.
2.2.2 Creation of Pattern Program for Production Model
A pattern program is required for the automatic operation of the machine.
Reference
Refer to "Chapter 2 Pattern Program" in Volume 2 for details.
2.2.3 Registration of Pattern Program for Production Model
Pattern programs and component library data must be transferred from the
network terminal (option) to the machine.
1OM-1603
3-14
2. Program Change Operation : Chap.3
1012-005
2.2.4 Preparation for Feeders
Procedure
(1) Refer to the placement feeder location data in the pattern program and
conrm that the required feeders are installed.
(2) Replenish each feeder with components.
Reference
Refer to the Instruction Manual for the “Tape Feeder” for SIGMA-G4/G5, for
the component reloading procedure onto a tape feeder.
(3) Install the feeders on the feeder base of the bank feeder change cart.
Note
Before installing the feeders, check which types of feeders should be
installed in which feeder slot Nos. (Fdr. No.).
WARNING
Those who wear implanted pacemakers are not
allowed to handle the tape feeders.
The pacemaker may be affected by the magnetism
and a serious accident will result.
CAUTION
When a tape feeder is attached or detached, be sure
not to drop it.
Otherwise, a foot injury will result or the feeder itself may
be damaged.
Carefully handle each feeder one by one and do not drop
any.
NOTICE
Be sure to install a feeder to the correct feeder slot
(Fdr No.).
Otherwise, some components may be trapped between the
heads.
Be sure to insert the feeder deep inside.
Otherwise, if the suppressor is unhooked or lifted aoat,
it cannot be detected, causing the suppressor to interfere
with a head.
Install the feeders correctly such that they are seated
properly.
Otherwise, they may collide with the head sections or a
pickup error will occur.
1OM-1603
3-15
2. Program Change Operation : Chap.3
1012-004
(4) Attach the bank feeder change cart to the machine.
Reference
(a) Refer to "Attachment and Detachment of Tape Feeders" in the
instruction manual of the tape feeders for how to install the tape
feeders on the bank feeder change cart.
(b) Refer to "3.8 Cart Installation Section" in "Chapter 1" for how to
attach the bank feeder change cart.
CAUTION
Hazardoustoyourhandsandngers!
Be sure to hold the handle to move the bank feeder
change cart.
Watch
yourstep!
Be careful not to hit your foot against the cart while
moving the bank feeder change cart.
Especially, the resistance against cart movement may
change rapidly when the oor is ragged and the cart
gets caught on the oor or a sheet is used and the cart
gets caught at the edge or a slackened portion of the
sheet.
•
Make sure to insert the feeder into the deep end.
When the tape feeder is mounted onto the feeder
carriage, make sure that it has been inserted into the
deep end and xed securely.
In the case that it has not been xed securely, the tape
feeder might fall, which might cause a lower leg injury
or damage to the feeder..
Feeder Workbench
Bank Feeder Change Cart
Feeder Base
F1C13