SIPLACE Line Computer UNIX - 第568页
17 Practical Tips on Using the LC UNIX User Manual Line Computer UNIX 17.4 Set-Up Generat ion Software Version 502.xx 10/2000 Issue 566 I t I I 17.4.2 Automat ic Set-Up Ge neration Starting O ptimizati on for lot file St…

User Manual Line Computer UNIX 17 Practical Tips on Using the LC UNIX
Software Version 502.xx 10/2000 Issue 17.4 Set-Up Generation
565
I
t I I
To open the optimization dialog, proceed as follows:
1. Click on the Optimization dialog icon .
The optimization dialog is opened.
To create a lot file, proceed as follows:
2. Activate the Create icon .
A window is opened.
3. Click on the editing field and enter a name for the lot file, here: Examples.lose.
4. Click on the OK button.
Job Control is opened.
To edit a lot file, proceed as follows:
5. In Job Control activate the Create icon , then activate the Edit support icon .
The Edit support Lot Data is opened.
6. Select the PCB you wish to edit by double-clicking, here: Example_1.la .
The PCB is transferred to the Selection: field.
7. Click on the Abort button, the other data are not used at this point.
Edit support is closed. The selected PCB is transferred to the editing area.
8. In the editing area click on the Lot name field and enter the lot name, here: ex1.
9. In the editing area click on the Lot size field and enter the lot size, here: 10.
10. In the editing area click on the Lot type field and enter the lot type, here: F.
11. Click on the OK button.
The job is transferred to the lot file. In the case of faulty entries, the respective field is surrounded by a red
frame and an error message is displayed above the list. Correct the entry.
12. Insert the remaining PCBs analogously, here: Example_2.la and Example_3.la, see chart.
To create the basic optimization data, proceed as follows:
13. Click on the Basic Optimization Data... command on the SERVICES menu.
The Basic optimization data window is opened.
14. Activate the Create icon and then activate the Edit support icon .
The Edit support Basic Optimization Data is opened.
15. Select the line, here: SMT.AK, and the subline, here: Linie.VA, by double-clicking.
16. Click on the Abort button, no fixed or initial set-ups are used here. The edit support is closed.
The selected data are transferred to the editing area.
17. Click on the OK button.
The data are transferred to the list.
18. Click on the Quit command on the FILE Menu.
A dialogbox containing a request for saving data is opened
19. Click on the Yes button.
The Basic optimization data window is closed, the data are saved.
To save the lot file, proceed as follows:
20. Click on the Save command on the FILE menu.
The lot file is saved in the Job Data under the entered name.
21. Click on the Quit command on the FILE menu.
Job Control is closed. The Optimization Dialog is opened.
PCB Lot name Lot size
Lot
type
Example_1.la ex1 10 F
Example_2.la ex2 13 F
Example_2.la ex3 16 F

User Manual Line Computer UNIX 17 Practical Tips on Using the LC UNIX
Software Version 502.xx 10/2000 Issue 17.4 Set-Up Generation
567
I
t I I
To start Optimization for a lot file, proceed as follows:
1. In the Optimization Dialog activate the Read in directory icon .
The new lot file is listed.
2. Activate the Start icon .
3. Click on the Examples.lose lot file.
Optimization of the lot file is started. The Info Box indicates the progress and the phases of the process,
as well as production time and the changeover time of the set-ups being calculated.
Upon the successful optimization, the status of the lot file is indicated as optimized. The set-up name
here: Examples01.ar is automatically assigned to the optimized set-up.
If errors are encountered during Optimization, the optimization run is aborted and the status of the lot file
is indicated as faulty. In the case of an error, proceed as follows:
— Activate the Select icon .
— Click on the faulty job.
— Click on the View error file option on the SERVICES menu.
The File display containing the error file is opened.
— Correct the errors displayed.
— Click on the Quit option on the FILE menu.
File display is closed.
— Optimization is re-started.
To check the producibility of a lot file:
4. Activate the Select icon .
5. Click on the Examples.lose lot file.
6. Click on the Producibility check option on the SERVICES menu.
The producibility check is started. Upon the successful check, the status of the jobs is indicated as
R (=ready).
To obtain a printout of the optimized set-up, proceed as follows:
7. Click on the Examples.lose lot file.
8. Click on one of the jobs of this lot file.
9. Click on the Display set-up option on the SERVICES menu.
The Set-Up Modification Generator is opened.
10. In the Set-Up Modification Generator activate the Set-up modification instructions button.
The set-up changeover instructions are displayed.
11. On the FILE menu click on the Print command, then Print Line.
The set-up is printed out for all stations.
12. Click on the Quit option on the FILE menu.
The Set-Up Modification Generator is closed.
13. After optimization has been successfully completed, click on the Quit option on the FILE menu.
The Optimization Dialog is closed.
